Enterprise resource planning (ERP) systems are software module packages which can be customized up to a certain limit to suit the specific needs of each organization. Many ERP projects have not been effective at achieving all of the intended results due to high cost and high failure risks in ERP implementation. This study integrates the prior theories and knowledge gained from several textile industry practitioners for ERP projects. A two-stage method involving the Delphi and analytic hierarchy process decision support methodology was conducted. Based on the case of the textile industry in Taiwan, the findings illustrate the top 10 key factors: a clear project plan by defined ERP capacity requirement; a limited scope and focused flowchart; goal congruence between ERP project implementation and corporate strategy; top management support and commitment; the extent of standard operating procedures and institutional processes; a user-friendly interface; systems integrated with aggressive schedules and timelines; provision of technical assistance for rapid, effective transfer of best practice interventions; good interdepartmental communication and coordination on a focused issue solution; and enablement of business process reengineering and solid management for project team building. The findings of this research will be beneficial to those apparel companies that adopted the ERP.
Citation: Yueh-Hsia Huang, Lan Sun, Tyng-Bin Ger. An analysis of enterprise resource planning systems and key determinants using the Delphi method and an analytic hierarchy process[J]. Data Science in Finance and Economics, 2023, 3(2): 166-183. doi: 10.3934/DSFE.2023010
[1] | Chong Li, Guoqiong Long, Shuai Li . Research on measurement and disequilibrium of manufacturing digital transformation: Based on the text mining data of A-share listed companies. Data Science in Finance and Economics, 2023, 3(1): 30-54. doi: 10.3934/DSFE.2023003 |
[2] | Ehsan Ahmadi, Parastoo Mohammadi, Farimah Mokhatab Rafei, Shib Sankar Sana . Behavioral factors and capital structure: identification and prioritization of influential factors. Data Science in Finance and Economics, 2025, 5(1): 76-104. doi: 10.3934/DSFE.2025005 |
[3] | Man-Fai Leung, Abdullah Jawaid, Sai-Wang Ip, Chun-Hei Kwok, Shing Yan . A portfolio recommendation system based on machine learning and big data analytics. Data Science in Finance and Economics, 2023, 3(2): 152-165. doi: 10.3934/DSFE.2023009 |
[4] | Paarth Thadani . Financial forecasting using stochastic models: reference from multi-commodity exchange of India. Data Science in Finance and Economics, 2021, 1(3): 196-214. doi: 10.3934/DSFE.2021011 |
[5] | Shuanglian Chen, Cunyi Yang, Khaldoon Albitar . Is there any heterogeneous impact of mandatory disclosure on corporate social responsibility dimensions? Evidence from a quasi-natural experiment in China. Data Science in Finance and Economics, 2021, 1(3): 272-297. doi: 10.3934/DSFE.2021015 |
[6] | Mesbaul Haque Sazu, Sakila Akter Jahan . Impact of blockchain-enabled analytics as a tool to revolutionize the banking industry. Data Science in Finance and Economics, 2022, 2(3): 275-293. doi: 10.3934/DSFE.2022014 |
[7] | Wojciech Kurylek . Are Natural Language Processing methods applicable to EPS forecasting in Poland?. Data Science in Finance and Economics, 2025, 5(1): 35-52. doi: 10.3934/DSFE.2025003 |
[8] | Sangjae Lee, Joon Yeon Choeh . Exploring the influence of online word-of-mouth on hotel booking prices: insights from regression and ensemble-based machine learning methods. Data Science in Finance and Economics, 2024, 4(1): 65-82. doi: 10.3934/DSFE.2024003 |
[9] | Haihua Liu, Shan Huang, Peng Wang, Zejun Li . A review of data mining methods in financial markets. Data Science in Finance and Economics, 2021, 1(4): 362-392. doi: 10.3934/DSFE.2021020 |
[10] | Anatoly A. Kilyachkov, Larisa A. Chaldaeva, Nikolai A. Kilyachkov . Dynamics of stability of the world economic system. Data Science in Finance and Economics, 2023, 3(1): 101-111. doi: 10.3934/DSFE.2023006 |
Enterprise resource planning (ERP) systems are software module packages which can be customized up to a certain limit to suit the specific needs of each organization. Many ERP projects have not been effective at achieving all of the intended results due to high cost and high failure risks in ERP implementation. This study integrates the prior theories and knowledge gained from several textile industry practitioners for ERP projects. A two-stage method involving the Delphi and analytic hierarchy process decision support methodology was conducted. Based on the case of the textile industry in Taiwan, the findings illustrate the top 10 key factors: a clear project plan by defined ERP capacity requirement; a limited scope and focused flowchart; goal congruence between ERP project implementation and corporate strategy; top management support and commitment; the extent of standard operating procedures and institutional processes; a user-friendly interface; systems integrated with aggressive schedules and timelines; provision of technical assistance for rapid, effective transfer of best practice interventions; good interdepartmental communication and coordination on a focused issue solution; and enablement of business process reengineering and solid management for project team building. The findings of this research will be beneficial to those apparel companies that adopted the ERP.
Abbreviations: ERP: Enterprise resource planning; AHP: Analytic hierarchy process
It is well documented that ERP systems are beneficial to business operations (Ragowsky & Somers, 2002; Beatty & Williams, 2006); however, the implementation of ERP systems can be costly and time-consuming. Likewise, the software installation and system operating costs can be translated into a real financial burden for a company. The human resources and staffing are also expensive, and the training of staff for the complex system is tedious. Moreover, if any component of an ERP system is not implemented correctly or the technology is incompatible or inefficient for the business structure, the huge capital expenditure and human cost will become a receipt of disaster which may lead to the demise of some companies (Davenport, 1998; Martin, 1998; Parr & Shanks, 2000; Olson, et al. 2013). In practice, the implementation of ERP systems is overly complex, with a highly technical architecture and high operating cost; the enormous amount of time is spent on integrating the system to fit into the organization, and these factors are suggested to be the main reasons for a successful rate when implementing an ERP system (Davenport, 1998; Martin, 1998). Previous studies of ERP systems have focused on understanding the factors leading to either the success or failure of ERP implementation, and the aim is usually to assist those enterprises which currently have an ERP system in place or are planning to change to this system to achieve greater success and less failure (Bradley, 2008; Kim et al., 2005; Morteza & Zare, 2013; Olson & Staley, 2012; Sumner, 2006). Even after spending millions of dollars on investing in ERP systems, some companies are still facing ongoing challenges (Parr & Shanks, 2000; Olson et al., 2013). Olson and Zhao (2007) pointed out that 70% of the companies had failed to achieve the objectives after implementing ERP. Moreover, the implementation of ERP involves different phases, and each phase embeds the crucial factors affecting the ERP implementation success and failure. These crucial factors include top management support, consultant experience, vendor capacity, staff feedback and evaluation, organizational process and reengineering, etc; and, beyond all of these factors, the managers' ability to control these issues is the key to the success of ERP implementation. Kwahk & Lee (2008) argued that, in fact, ERP systems were still experiencing higher failure rates, with approximately 60% to 90% of the companies failing to implement the ERP systems. While some companies understand the importance of those key success factors, they failed in the ground operation and execution (Basoglu et al., 2007; Kwahk & Lee, 2008).
In a local context, Taiwanese businesses that have been successful in ERP implementation show some influential findings. For instance, the electronics industry has focused on, for example, information sharing, project organization and management (Cai, 1999); the organizational structure, project management, information technology and business management (Zhang, 2000); or organizational and personnel factors, and ERP software configuration (Dai, 2007). The traditional manufacturing sector has focused on an organization's internal environment, the ERP user and consultant support (Zhang et al., 2013). The telecommunication sector emphasizes the organizational structure, technology and external environment (Bai, 2007). The construction sector focuses on four key issues, including the internal environment, software vendor characteristics, system configuration and implementation outcomes (Huang, 2006). The review of these studies indicates that each industry will have its unique success factors in the ERP selection and implementation process. According to the white paper on small- and medium-sized enterprise research (2010), Taiwanese industries are classified into nine major sectors: garments, underwear, bags and suitcases, sweaters, towels, hosiery, swimwear, bedding and shoes. Each industry is further divided into small sub-sectors. For example, the garment industry has a wide range of sub-sectors, including upstream and downstream industries such as fiber manufacturing, spinning, weaving, dyeing, finishing, clothing and apparel. In a global supply chain, the garment exporting companies often experience an overwhelmingly high demand. The clothing specifications and requirements of fabrics, accessories, materials and styles are often complex and change from time to time; and, the clients demand just-in-time delivery and high-quality products. As such, the smooth and efficient operation of handling the complexity and competition existing in the garment industry will, to some extent, rely on an integrated and effective information system. However, the white paper on small- and medium-sized enterprise research (2019) reported that ERP implementation in the over 50 workers' businesses was roughly 80% in the manufacturing industry and 50% only in the service industry.
This case study was based on R enterprise, which had the first ERP system installed in 2002; the full-scale implementation was launched after 2007. During 2013, the company adopted a growth strategy and expanded rapidly overseas, with the number of multinational operations and manufactories increasing every year. Whenever launching new ventures in different countries or experiencing expansion of the existing manufacturing plants in their home country, the company must operate under the so-called dual system, whereby the old system coexists during the period of transformation to the new ERP system. The challenges are immense during the transformation period because the work is doubled and the different management styles in multiple locations eventually cost its business. The ERP system modules currently in use have failed to meet the managerial requirements. The new system is not easy to customize, is difficult to operate and, at the same time, involves many other issues, such as incompatibility and difficulty in making the necessary adjustments and modifications. All of these issues need to be resolved when transforming from the old system to the new one; if these issues are not resolved, there is a risk of running a dual system in one organization, which would lead to much more ongoing complexity and complications. The general management office in the home country revises the ERP systems on a yearly (or monthly) basis, and the purpose is to effectively facilitate and integrate a fast-growing and independent financial system. However, the administration has not been able to provide a complete set of ERP system. This study aims to explore the key success factors for ERP system implementation in the garment industry through analysis of the case of R enterprise. The findings are expected to provide useful insight for the companies that are preparing a second implementation of ERP.
This study involved applying a two-stage Delphi method and analytic hierarchy process (AHP; Saaty 2000) to conduct an exploratory analysis of ERP systems and examine how the professional and organizational issues have contributed to the success of ERP implementation.
The starting point was a review of the literature; from the previous studies, the factors for successful ERP implementation were initially identified and, subsequently, these factors were proposed to construct the first-round Delphi questionnaire. Five experts/scholars were selected to participate in the 3-round Delphi interview. After interviewing the five experts/scholars, the factors that were recommended to be the key common issues that influence the success of ERP systems were then discussed, summarized and grouped to design the second-stage AHP questionnaire.
First of all, the questionnaire design can be divided into the following five steps: 1. selecting experts; 2. collecting questions and sorting; 3. the first-round questionnaires 4. the second-round questionnaire; 5. forming general comments and consensus. If there is no consensus that can be researched by the experts/scholars, repeat Steps 3 and 4 to have consistent results.
Step 1: Selecting experts. According to Linstone (1978), experts or scholars need to have a high level of familiarity in the field of ERP to be qualified to give any representative opinions in the interview. Therefore, this study utilized three industry experts who have more than five years' experience in ERP system implementation and two professors with relevant research and professional backgrounds in this area to form the interview panel, totaling five experts/scholars. The experts' background and experience are summarized in Table 1.
Industry Working Experience | Using ERP Experience | ||||
Expert ID | ERP System Experience (Y/N) | 5–10 Years | > 10 Years | 5–10 Years | > 10 Years |
Expert A | Y | Y | Y | ||
Expert B | Y | Y | Y | ||
Expert C | Y | Y | Y | ||
Expert D | Y | Y | Y | ||
Expert E | Y | Y | Y |
Step 2: ERP key successful factors collection and collation. The five experts and scholars reviewed the literature, both domestic and international studies, and identified initial key ERP success factors that include four aspects, 12 guidelines and 48 evaluation criteria, as shown in Table 2. These became the base questions used in the first-round questionnaire.
Aspects | Guidelines | Evaluation Criteria |
Enterprise/ Organization resources (Ye and Chen, 2005) | Enterprise environmental resources (Bradley, 2008), Organizational and process improvement (Olson and Zhao, 2007), Project planning and management (Vasilash, 1997). | Top management support and commitment (Maskell, 1991), Budget support and sufficient economic resources (Shanley, 1997), Excellent information environment (West, 1998), Sufficient project resources and authorization (Wall and McKineey, 1998), Enablement of business process reengineering (Bingi et al., 1999), Clear project plan based on defined ERP capacity requirement, limited scope and focused flowchart (Laughlin, 1999), Transparency level of the overall information flow and documentation process (Huang and Lin, 2012), Standard operating procedures and institutional processes (Davenport, 1998), Ability to accelerate and shorten the operation cycle of the company (Wu and Huang, 2008), Feasible and effective project schedule (Parr and Shanks, 2000), Attention to problem-solving (Holland and Light, 1999), Establishment of the optimal cross-departmental task force (Wall and McKineey, 1998). |
System user (Zhang et al., 2013) | Users' ability (Ye and Chen, 2005), Execution process (Liu, 2003), Staff awareness (Ling, 2010). | Staff professional competence and the ability to coordinate the project (Zhang et al., 2013), Staff has ability to understand and use information (Ye and Chen, 2005), Users have basic information literacy (Shanley, 1997), Users' attitude and engagement in system implementation (Xie, 2001), Strong leadership from the project team (Parr and Shanks, 2000), Good interdepartmental communication and coordination on focused issue solution (Vasilash, 1997), Ability to placate and eliminate employee resistance to new system (Shanley, 1997), Stable project team members (Nah, 2006), Staff acceptance and agreement (Lin, 2010), Staff attitude and resistance to change (Lin, 2010), Employee morale and commitment (Lin, 2010), Trust within the organization (Lin, 2010). |
ERP technique and vendor (Zhang et al., 2013) | System design and integration capabilities (Oliver, 1999), System vendor's specialty (Bingi et al., 1999), Vendor's technical support (Lin, 1999). | User-friendly interface (Wu and Huang, 2008), System is customizable and flexible enough to be modified (Wu and Huang, 2008), System incorporates an aggressive schedule and timeliness (Ye and Chen, 2005), System can effectively integrate different companies and regions and operate in different currency systems (Huang and Lin, 2012), Provide timely information for management decision-making (Wu and Huang, 2008), Manufacturer R & D capacity in new program development (Lin, 2010), Supplier can provide integrated software and can update the software when the company is continuing developing (Huang and Lin, 2012), Provide technical assistance for rapid, effective transfer of best practice interventions (Huang and Lin, 2012), Supplier can assist with the system implementation, testing, operation, maintenance and upgrade (Huang and Lin, 2012), Maintain good interaction with the company (Shanley, 1997), Assist the company to successfully install software and hardware (Guo, 1999), Supplier can work with the company to develop internal process and management software (Huang and Lin, 2012). |
Consultant service (Ye and Chen, 2005) | Consultant service details (Liu, 2003), Consultant team specialty (Xu, 2000), Technique support (Huang and Lin, 2012). | Consultancy fees charged level (Martin, 1998), Timely response to the company requirements (Liu, 2003), Assist the company staff in training and education and technology transfer (Bingi et al., 1999), Clear and effective implementation of quality assurance (Liu, 2003), Consultant can analyze the company's past, present and future operational capacity (Davenport, 1998), Consultant have a good understanding of the nature of business and competition (Ye and Chen, 2005), Consultant has high familiarity with ERP system modules and operating procedures (Martin, 1998), Consultant have a similar experience of successfully implementing the system (Oliver, 1999), Consultant can build in cost-benefit metrics and analytical tools (Wall and McKineey 1998), Level of control in the system implementation schedules (West, 1998), Consultant can work with the project team members and understand each other (Martin, 1998), Consultant can analyze the company's current HR and economic resource allocation (Martin, 1998). |
Source:based on the literature review conducted by authors. |
Step 3: First-round questionnaire. Develop the questionnaire and distribute it to experts and scholars. All of the key ERP factors listed in Table 2 were used to design the Delphi questionnaire; it was sent to the experts and scholars who had been selected for the interview; then, phone calls were made to confirm the time for the first face-to-face meeting. During the first meeting, the interviewer typically spent about 2–3 hours to explain the tasks, and for each of the factors on the questionnaire, the experts and scholars had three options: they could choose either agree, delete or modify. If they chose the option of modify, there was an extra column where the experts and scholars needed to fill in details to support the modification. Apart from selecting based on the existing factors, the experts and scholars could also recommend other factors in the overall comments column in the questionnaire. After the questionnaire was completed, it was mailed back to begin data entry and collection work. Using descriptive statistics, these survey results will be presented in the form of frequency distribution tables.
Step 4: Second-round questionnaire. We distributed the second questionnaire with added and deleted factors and/or new opinions. At the same time, we printed out the results from the first questionnaire, i.e., the frequency distribution table, and sent both the second questionnaire and the frequency distribution table generated from the first questionnaire to the experts and scholars. After reviewing the results from the first questionnaire, the experts and scholars filled out the second questionnaire to either maintain or modify their views. In the second questionnaire, the experts and scholars no longer needed to have a face-to-face interview, so the whole process was done by telephone. Once the questionnaire was completed, the experts and scholars needed to mail the documents back, and this was followed by data entry and collection work again.
Step 5: Third-round questionnaire to determine key success factors. To avoid spending excessive time on the survey, we adopted an upper limit of a maximum of three times for the Delphi interview. The first two interviews were conducted in a traditional way of correspondence, and the third interview entailed an online meeting. As soon as the opinions were collected, the key factors were assessed and used to design the subsequent AHP questionnaire.
To assess whether the framework (see Table 2) was sufficient and appropriate to contain the four aspects, 12 guidelines and 48 evaluation criteria, the first-stage Delphi method was applied and the questionnaires were distributed to the experts. The survey was conducted through two traditional face-to-face interviews and one online conference. The interviewer collected the questionnaires from the five selected experts and scholars for the three occasions, and, through the review of the experts' responses, as well as suggestions to those open questions, the framework and its layout were further revised. The results show that the experts reached a consensus on the following amendments: deleting 14 criteria and revising three criteria in the Tier 3 evaluation criteria for the aspect 'ERP technique and vendor'; adding two new factors, namely, 'system implementation is in alignment with company's strategic visions'; 'the professional level in the field of work and familiarity with the process', 'education and training of the project members and users', 'provision of good after-sales service and technical support', 'a good understanding of company's visions and strategies' and 'good communication and coordination skills'. Finally, we designed the AHP questionnaire based on the results generated from the first-stage Delphi expert questionnaires. The Delphi results were screened and used to form the key ERP successful factors in the AHP questionnaire (see Table 3, Tiers 1 to 3), which was distributed mainly to the top executives in the case company.
Top Manager ID | Working Experience | Education Level | |||
< 5 Years | 5–10 Years | 10–15 Years | > 15 Years | ||
Manager A | Y | Master Degree | |||
Managers B–G | Y | 1 Master Degree & 5 Bachelor Degrees | |||
Managers H–I | Y | 2 Bachelor Degrees | |||
Manager J | Y | Bachelor Degree |
The main participants in the AHP questionnaire were the top decision-makers who had executive power in determining the fate of the project for the case company, and they were interviewed to enhance the accuracy of the AHP test. The top managers' backgrounds and experience were summarized in Table 3. The questionnaires were then collected and the weights were calculated for the case company's key ERP success factors. The AHP questionnaire framework is shown in Table 4.
Tier 0 | Tier 1 | Tier 2 | Tier 3 |
Objective A | Aspect B | Guideline C | Evaluation Criteria D |
ERP Key Success Factors | Enterprise/ organization resources B1 |
Enterprise environmental resources C1 |
Top management support and commitment D1 |
Budget support and sufficient economic resources D2 | |||
Excellent information environment D3 | |||
Organizational and process improvement C2 |
Enablement of business process reengineering D 4 | ||
Standard operating procedures and institutional processes D5 | |||
Clear project plan by defined ERP capacity requirement, limited scope and focused flowchart D6 | |||
Project planning and management C3 |
Goal congruence between ERP project implementation and corporate strategy D7 | ||
Feasible and effective project schedule D8 | |||
Attention to problem-solving D9 | |||
System user B2 |
Employee competence C4 |
Professional competence and the familiarity with the project D10 | |
Staff professional competence and the ability to coordinate the project D11 | |||
Staff has ability to understand and use information D12 | |||
Execution process C5 |
Strong leadership from the project team D13 | ||
Good interdepartmental communication and coordination on focused issue solution D14 | |||
Education and training to project team members and users D15 | |||
Staff awareness C6 |
Staff acceptance and agreement D16 | ||
Staff attitude and resistance to change D17 | |||
Employee morale and commitment D18 | |||
ERP technique and vendor B3 |
System design and integration capabilities C7 |
User-friendly interface D 19 | |
Customizability and flexible for modification D20 | |||
Systems integrated with an aggressive schedule and timeliness D21 | |||
System vendor's specialty C8 |
Manufacturer R & D capacity in new program development D22 | ||
Supplier can provide integrated software and can update the software to facilitate the company's growth D23 | |||
Provide technical assistance for rapid, effective transfer of best practice interventions D24 | |||
Vendor's technical support C9 |
Supplier can assist with the system implementation, testing, operation, maintenance and upgrade D25 | ||
Good customer service after-sales and technical support D26 | |||
Maintain good interaction with the company D27 | |||
Consultant service B4 |
Consultant service details C10 |
Consultancy fees D28 | |
Timely response to the company requirements D29 | |||
Assist the company staff in training and education and technology transfer D30 | |||
Consultant team specialty C11 |
Consultants have a similar experience of successfully implementing the system D31 | ||
Consultants have a good understanding of the company's goals and strategies D32 | |||
Consultant has high familiarity with ERP system modules and operating procedures D33 | |||
Consultant technique support C12 |
Good communication and coordination skills D34 | ||
Consultant can build in cost-benefit metrics and analytical tools D 35 | |||
Level of control in the system implementation schedules D36 | |||
Source:based on the analysis conducted in this study. |
The AHP survey targeted senior executives and entailed issuing 10 questionnaires using a nine-point scale. After the compilation and analysis of the data, there was no incomplete questionnaire or inconsistent information provided in the questionnaires; hence, the effective recovery rate was 100%. Based on the AHP questionnaire framework (Table 4), we analyzed the key factors that were suggested to affect ERP system implementation, as well as analyzed and compared every two elements in Tier 1 (Tier 2 and Tier 3) to reveal the relative importance of the key success factors.
To ensure a high confidence interval for the respondents to have a consistent view on the importance level of key factors, a consistency ratio was used to assess the degree of consistency at each tier. The analysis of the consistency ratio shows that the overall aspects in the first tier, four guidelines in the second tier and 12 evaluation criteria in third tier all had consistency ratios less than 0.1, indicating a high level of consistency between the different tiers (Table 5).
Aspects | Tier Weight | Guidelines | Tier Weight | Accumulated Weight | Accumulated Ranking | Evaluation Criteria | Tier Weight | Accumulated Weight | Overall Ranking |
Enterprise/ Organization resources | 0.569 | Enterprise environmental resources | 0.229 | 0.130 | 4 | Top management support and commitment | 0.658 | 0.086 | 3 |
Budget support and sufficient economic resources | 0.220 | 0.029 | 14 | ||||||
Excellent information environment | 0.122 | 0.016 | 21 | ||||||
Organizational and process improvement | 0.454 | 0.258 | 1 | Enablement of business process reengineering | 0.156 | 0.040 | 9 | ||
Standard operating procedures and institutional processes | 0.304 | 0.079 | 4 | ||||||
Clear project plan based on defined ERP capacity requirement, limited scope and focused flowchart | 0.540 | 0.140 | 1 | ||||||
Project planning and management | 0.317 | 0.180 | 2 | Goal congruence between ERP project implementation and corporate strategy | 0.662 | 0.119 | 2 | ||
Feasible and effective project schedule | 0.174 | 0.031 | 11 | ||||||
Attention to problem-solving | 0.164 | 0.030 | 13 | ||||||
System user | 0.202 | Employee competence | 0.131 | 0.027 | 10 | Professional competence and the familiarity with the project | 0.451 | 0.012 | 26 |
Staff professional competence and the ability to coordinate the project | 0.398 | 0.011 | 27 | ||||||
Staff has ability to understand and use information | 0.151 | 0.004 | 32 | ||||||
Execution process | 0.546 | 0.110 | 5 | Strong leadership from the project team | 0.361 | 0.040 | 10 | ||
Good interdepartmental communication and coordination on focused issue solution | 0.490 | 0.054 | 8 | ||||||
Education and training for project team members and users | 0.149 | 0.016 | 20 | ||||||
Staff awareness | 0.323 | 0.065 | 7 | Staff acceptance and agreement | 0.365 | 0.024 | 17 | ||
Staff attitude and resistance to change | 0.404 | 0.026 | 16 | ||||||
Employee morale and commitment | 0.230 | 0.015 | 24 | ||||||
ERP technique and vendor | 0.154 | System design and integration capabilities | 0.545 | 0.164 | 3 | User-friendly interface | 0.445 | 0.073 | 5 |
Customizability and flexible for modification | 0.190 | 0.031 | 12 | ||||||
Systems integrated with aggressive schedule and timeliness | 0.365 | 0.060 | 6 | ||||||
System vendor's specialty | 0.300 | 0.090 | 6 | Manufacturer R & D capacity in new program development | 0.176 | 0.016 | 22 | ||
Supplier can provide integrated software and can update the software to facilitate the company's growth | 0.221 | 0.020 | 19 | ||||||
Provide technical assistance for rapid, effective transfer of best practice interventions | 0.603 | 0.054 | 7 | ||||||
Vendor's technical support | 0.155 | 0.047 | 9 | Supplier can assist with the system implementation, testing, operation, maintenance and upgrade | 0.602 | 0.028 | 15 | ||
Good customer service after-sales and technical support | 0.208 | 0.010 | 28 | ||||||
Maintain good interaction with the company | 0.189 | 0.009 | 29 | ||||||
Consultant service | 0.075 | Consultant service details | 0.159 | 0.012 | 11 | Consultancy fees | 0.151 | 0.002 | 36 |
Timely response to the company requirements | 0.628 | 0.007 | 30 | ||||||
Assist the company staff in training and education and technology transfer | 0.221 | 0.003 | 34 | ||||||
Consultant team specialty | 0.697 | 0.052 | 8 | Consultants have a similar experience of successfully implementing the system | 0.458 | 0.024 | 18 | ||
Consultants have a good understanding of the company's goals and strategies | 0.298 | 0.015 | 23 | ||||||
Consultants have high familiarity with ERP system modules and operating procedures | 0.245 | 0.013 | 25 | ||||||
Consultant technique support | 0.145 | 0.011 | 12 | Good communication and coordination skills | 0.482 | 0.005 | 31 | ||
Consultants can build in cost-benefit metrics and analytical tools | 0.190 | 0.002 | 35 | ||||||
Level of control in the system implementation schedules | 0.327 | 0.004 | 33 | ||||||
Source: based on the analysis conducted by this study. |
The factor weight is also known as the local priority, which indicates the relative weight of each factor for each tier. The overall weight is known as the global priority, calculated as the weight of the prior tier multiplied by the relative weight of various elements of the current tier; it shows the relative importance of various elements of the current tier as compared to the overall weight. For example, in this case study, it is as follows: Overall Weight = Weight of Tier 1 × Weight of Tier 2 × Weight of Tier 3. As a result, the overall weight was derived for the four major aspects, 12 guidelines and 36 key evaluation criteria (see Table 5), showing the rank as per the order of importance.
This study also graphically explains the key aspects, guidelines and evaluation criteria based on Table 6. The y axis represents the rank of aspects (Figure 1), guidelines (Figure 2) and evaluation criteria (Figure 3) for Tier 1, Tier 2 and Tier 3 in the AHP framework; the x axis shows the weight for each element. Using Microsoft Excel to analyze the weights of the overall factors, Figure 1 was constructed to show that 'Enterprise/ Organization resources' was ranked first, followed by 'System user', 'ERP technique and vendor' and, the last, 'Consultant service'.
Factors by Tier | Consistency Ratio |
(Tier 1) Overall factors | 0.0192 |
(Tier 2) Enterprise/ Organization resources | 0.0009 |
(Tier 2) System user | 0.0001 |
(Tier 2) ERP technique and vendor | 0.0025 |
(Tier 2) Consultant service | 0.0019 |
(Tier 3) Enterprise environmental resources | 0.0045 |
(Tier 3) Organizational and process improvement | 0.0005 |
(Tier 3) Project planning and management | 0.0024 |
(Tier 3) Employee competence | 0.0001 |
(Tier 3) Execution process | 0.0008 |
(Tier 3) Staff awareness | 0.0001 |
(Tier 3) System design and integration capabilities | 0.0002 |
(Tier 3) System vendor's specialty | 0.0011 |
(Tier 3) Vendor's technical support | 0.0001 |
(Tier 3) Consultant service details | 0.0001 |
(Tier 3) Consultant team specialty | 0.0004 |
(Tier 3) Consultant technique support | 0.0023 |
Figure 2 shows that case company R focuses on comparing the top three or six guidelines in the AHP questionnaire. The top three guidelines and the corresponding accumulated weights were 'Organizational and process improvement' (0.258255937), 'Project planning and management' (0.18042832) and 'System design and integration capabilities' (0.164186237), with a total accumulated weight and combined explanatory power of 60.28%. In addition to the top three ranked guidelines, 'Enterprise environmental resources' (0.130099741) was ranked number four, 'Execution process' (0.110193887) was ranked number five and 'System vendor's specialty' (0.090330484) was ranked number six. In all, the top six guidelines altogether account for 93.34% of the accumulated weight.
After analyzing the 36 evaluation criteria (Figure 3), the top 10 ranked criteria were 'Clear project plan based on defined ERP capacity requirement, limited scope and focused flowchart' (0.13956222), 'Goal congruence between ERP project implementation and corporate strategy' (0.11949798), 'Top management support and commitment' (0.08556945), 'Extent of standard operating procedures and institutional processes' (0.07850048), 'User-friendly interface' (0.07310360), 'Systems integrated with an aggressive schedule and timeliness' (0.0599498), 'Provide technical assistance for rapid, effective transfer of best practice interventions' (0.05449806), 'Good interdepartmental communication and coordination on focused issue solution' (0.05397480), 'Enablement of business process reengineering' (0.04019322) and 'Solid management for project team building' (0.03980844). In all, the top 10 evaluation criteria had a combined accumulative weight of 74.47%.
Overall, among the 36 evaluation criteria, four were ranked the highest, namely, a clear project plan based on a defined ERP capacity requirement, limited scope and focused flowchart; goal congruence between ERP project implementation and corporate strategy; top management support and commitment; and the extent of standard operating procedures and institutional processes. Meanwhile, if the analysis emphasized the aspects, Enterprise/ organization resources carried the highest weight (0.568), indicating a single aspect catches more than half of the total weight of all factors. This result is consistent with previous studies which suggest that organizational resources play a decisive role in shaping successful ERP system implementation (Davenport, 1998; Bingi et al., 1999; Zhang, 2000; Liu, 2003, Ye and Chen, 2005; Chauhan et al., 2012; Zhang et al., 2013). Interestingly, the consultant service factor carried the lowest weight (0.07), at less than 1%, suggesting that future improvement should be focused on strengthening an effective promotion of consultant services and technical support should be delivered to assist the company. Daniel (1961) argued that most companies should have at least three to six factors that are important to ERP success, and that these factors are the critical foundation that should be the focus of companies throughout the whole process to ensure that the system is successfully implemented.
Based on the analysis of the 12 guidelines, this study suggests that case company R carefully examine the current internal and external environment as it pertains to the company's position in the overall industry, the company's performance relative to its peers and competitors and the economic and environmental resources available inside the entity that R can utilize to gain a competitive advantage. The analysis was purposed to ensure that efficient resource allocation will be applied to the important factors which are ranked top for the R enterprise.
In addition, the results of this study indicate that senior managers generally recognize that the success of ERP system implementation is dependent on the organizational commitment, sufficient resource support and authorization, the attitude of the project leader, the competency of system users, the coordination and communication for the project, etc. Apart from focusing on the system implementation, the project team should also set up a special task group to constantly meet with each department to convey the aspiration and commitment from the top management and provide feedback to the top management as to whether each department has been able to adapt to the organizational changes.
In a similar vein, strong support, active envelopment and encouragement and due care should be given to relevant executives and project team members so that they will understand the company's policies, and that these top-end ideas are pragmatic and feasible. This is a crucial step because only the project executives need to change their attitudes toward the new system, as all of the project team members will then embrace the new system with motivation and positive energy. As such, the team will be unified on this project without resistance and the team members will be active in training and education, which makes the whole process much more efficient.
It is evident that the bottom six evaluation criteria were 'Consultancy fees', 'Consultant can build in cost-benefit metrics and analytical tools', 'Assist the company staff in training and education and technology transfer', 'Level of control in system implementation schedules', 'Staff has ability to understand and use information' and 'Good communication and coordination skills', from bottom one to bottom six, five of which are from 'Consultant service aspect'. This implies that, for the case company R, the future focus is to strengthen the ERP consultant communication and coordination.
Therefore, the decision-makers should carefully select ERP vendors, and, prior to decision-making, it is necessary for them to do their homework to have some knowledge about vendors, particularly, whether the vendors are capable of analyzing and integrating into the company's base conditions, such as R & D, production, HR function, finance and marketing budget; and, whether consultant services are explicitly in alignment with the current organizational goals and strategies.
This study involved employing a two-stage questionnaire based on the Delphi and AHP methods to generate the ranking to show the level of importance of key ERP success factors for R enterprise. The findings show that the top 10 key success factors are as follows: 1. clear project plan based on a defined ERP capacity requirement, limited scope and focused flowchart, 2. goal congruence between ERP project implementation and corporate strategy, 3. top management support and commitment, 4. extent of standard operating procedures and institutional processes, 5. user-friendly interface, 6. systems integrated with an aggressive schedule and timelines, 7. provision of technical assistance for rapid, effective transfer of best practice interventions, 8. good interdepartmental communication and coordination on focused issue solution, 9. enablement of business process reengineering and 10. solid management for project team building.
The ERP systems are different from the packaged software, so the vendor needs to accurately tailor and deliver a customized system that suits the enterprise (often, the preparation stage requires one year, but the problem-solving is on a daily basis starting from the implementation); and, for the corporation, it is about communication and coordination between the enterprise and the vendor and how to achieve a mutual agreement between the both parties. The company should have ongoing meetings and consultation with the ERP vendor, as well as the consultant. It is recommended that each department sends one or two special representatives to participate in the future meetings and work on the system's planning and implementation issues. Likewise, the consultant can also achieve a full understanding of the current state of organizational functions and characteristics through a close and practical working relationship; as a result, this is helpful in reducing the level of resistance and failure rate of reengineering processes throughout the business.
The authors declare they have not used artificial intelligence tools in the creation of this article.
All authors declare no conflict of interest regarding the publication of this paper.
[1] | Bai R, Li GG, Zeng WJ, et al. (2007) Discuss the influencing factors of the ERP system implementation from the aspects of organization, science and technology - multiple case studies of Taiwan enterprises. J E-bus 5: 175–196. |
[2] |
Basoglu N, Daim T, Kerimoglu O (2007) Organizational adoption of enterprise resource planning systems: A conceptual framework. J High Technol Mana Res 18: 73–97. https://doi.org/10.1016/j.hitech.2007.03.005 doi: 10.1016/j.hitech.2007.03.005
![]() |
[3] |
Beatty RC, Williams CD (2006) ERP Ⅱ: best practices for successfully implementing and ERP upgrade. Commu Acm 49: 105–109. https://doi.org/10.1145/1118178.1118184 doi: 10.1145/1118178.1118184
![]() |
[4] |
Bradley J (2008) Management based critical success factors in the implementation of enterprise resource planning systems. Int J Accountin Inf Syst 9: 175–200. https://doi.org/10.1016/j.accinf.2008.04.001 doi: 10.1016/j.accinf.2008.04.001
![]() |
[5] |
Bingi, P, Sharma MK, Godla Jk (1999) Critical issues affecting ERP implementation. Inf Syst Manag 16: 7–14. https://doi.org/10.1201/1078/43197.16.3.19990601/31310.2 doi: 10.1201/1078/43197.16.3.19990601/31310.2
![]() |
[6] | Cai YY (1999) The key success factors in ERP system implementation in Taiwan electronics industry (Master thesis), National Chung Hsing University, Research Center of Business Administration, Taichung. |
[7] | Chauhan R, Dwivedi R, Sherry AM (2012) Critical success factors for offshoring of enterprise resource planning (ERP) implementations. Bus Syst Res 3: 4–13. Available from: https://hrcak.srce.hr/ojs/index.php/bsr/article/view/12485. |
[8] | Dai Qinhe (2007) Discussion on the key success factors in upgrading ERP software - the case of electronics industry (Master thesis), Department of Information Management, Yuanzhong University, Taoyuan. |
[9] | Daniel DR (1961) Management Information Crisis. Harvard Bus Rev 39: 111–121. Available from: https://cir.nii.ac.jp/crid/1571417125685235712. |
[10] | Davenport TH (1998) Putting the Enterprise into the Enterprise System. Harvard Business School Press. |
[11] | Gu Yun (1999) Understanding of ERP. Inf Comput 228: 40–43. |
[12] | Huang ZH, Lin GH (2012) The use of network analysis to explore the key success factors in enterprise ERP system implementation. J Engi Technol Educ 9: 335–367. |
[13] | Huang Sien (2006) Applying AHP to explore key success factors of ERP for manufacturing sector (Master thesis). Department of Information Management, Private Kaian University, Taoyuan. |
[14] |
Holland C, Light B (1999) A critical success factors model for ERP implementation. IEEE Software 16: 30–36. https://doi.org/10.1109/52.765784 doi: 10.1109/52.765784
![]() |
[15] |
Kim Y, Lee Z, Gosain S (2005) Impediments to successful ERP implementation process. Bus Process Manag J 11: 158–170. https://doi.org/10.1108/14637150510591156 doi: 10.1108/14637150510591156
![]() |
[16] |
Kwahk KY, Lee JN (2008) The role of readiness for change in ERP implementation: Theoretical bases and empirical validation. Inf Manag 45: 474–481. https://doi.org/10.1016/j.im.2008.07.002 doi: 10.1016/j.im.2008.07.002
![]() |
[17] | Laughlin SP (1999) An ERP game plan. J Bus Strateg 20: 32–37. |
[18] | Lin XJ (2010) A study of key success factors of small and medium-sized enterprises in ERP implementation (Master thesis), National Cheng Kung University Master Program in Top Management, Taiwan Tainan. |
[19] | Liu YT (2003) Research on the key success factors for importing Oracle ERP systems (Master thesis), Information Management Research Center, National Central University, Taoyuan. |
[20] | Linstone HA (1978) The Delphi technique. In J. Fowlers (Ed.), Handbook of futures research. Westport, CT: Greenwood Press, 273–300 |
[21] | Martin MH (1998) Smart managing: best practices, careers, and ideas. Fortune 137: 149–51. |
[22] | Maskell BH (1991) Performance measurement for world class manufacturing: A model for American companies, Productivity Press, NY. |
[23] |
Morteza M, Zare RA (2013) Developing a practical framework for assessing ERP post-implementation success using fuzzy analytic network process. Int J Prod Res 51: 1236–1257. https://doi.org/10.1080/00207543.2012.698318 doi: 10.1080/00207543.2012.698318
![]() |
[24] |
Nah FFH (2006) Critical success factors for enterprise resource planning implementation and upgrade. J Comput Inf Syst 46: 99–113. https://doi.org/10.1080/08874417.2006.11645928 doi: 10.1080/08874417.2006.11645928
![]() |
[25] | Oliver R (1999) ERP is dead, long live ERP. Manag Rev 88: 12–13. |
[26] |
Olson DL, Zhao F (2007) CIOs' perspectives of critical success factors in ERP upgrade projects. Enterp Inf Syst 1: 129–138. https://doi.org/10.1080/17517570601088364 doi: 10.1080/17517570601088364
![]() |
[27] |
Olson DL, Chae BK, Sheu C (2013) Relative impact of different ERP forms on global manufacturing organisations: An exploratory analysis of a global manufacturing survey. Int J Prod Res 51: 1520–1534. https://doi.org/10.1080/00207543.2012.701772 doi: 10.1080/00207543.2012.701772
![]() |
[28] |
Olson DL, Staley J (2012) Case study of open-source enterprise resource planning implementation in a small business. Enter Inf Syst 6: 79–94. https://doi.org/10.1080/17517575.2011.566697 doi: 10.1080/17517575.2011.566697
![]() |
[29] | Parr A, Shanks G (2000) A model of ERP project implementation. J Inf Technol 15: 289–303. |
[30] | Ragowsky A, Somers TM (2002) Special section: Enterprise resource planning. J Manag Inf Syst 19: 11–16. |
[31] | Saaty TL (2000) Fundamentals of decision making and priority theory with the analytic hierarchy process (Analytic Hierarchy Process Series, Vol. 6). Pittsburgh, PA: Rws Publications. |
[32] | Shanley A (eds.) (1997) ERP in CPI: nine steps to successful implementation. Chemical Engineering, 86–88. Available from: http://www.chemengonline.com/articles/1985-1999/Vol104/chevol104_num11_135.html. |
[33] | SME Department of the Ministry of Economic Affairs (2010) White Paper on SMEs in the Ministry of Economic Affairs, China Institute of Economic Research. Available from: http://book.moeasmea.gov.tw/book/doc_detail.jsp?pub_SerialNo = 2010A01016 & click = 2010A01016. |
[34] | SME Department of the Ministry of Economic Affairs (2019) White Paper on SMEs in the Ministry of Economic Affairs, China Institute of Economic Research. Available from: https://www.facebook.com/smea.gov.tw/photos/a.436225466719404/1182200378788572/?type = 3 & theater. |
[35] | Sumner M (2006) Critical Success Factors in ERP Implementation: Five Years Laster. Proceedings of Americas Conference on Information Systems (AMCIS). 305–316. |
[36] | Vasilash GS (1997) How to and how not to implement ERP. Automotive Manufacturing & Production, 109: 64–65. |
[37] | Wall SJ, McKineey RS (1998) Wall-to-wall change. Across The Board, 37: 32–38. |
[38] | West RN (1998) Up and running in nine months. Manag Account 80: 20–27. |
[39] | Wu CX, Huang QP (2008) Using Delphi Method to explore the key success factors for SMEs in importing ERP, presented to 2008 Global Operations and Management and Industry Practice Symposium, Taiwan. |
[40] | Xie FY (2001) The use of balance scorecard in analysing ERP system and performance evaluation system (Master thesis), Department of Accounting, Tamkang University, Taipei. |
[41] | Xu WK (2000) Exploring the key factors in business ERP implementation (Master thesis), Department of Industrial Management, National Taiwan University of Science and Technology, Taipei. |
[42] | Ye ML, Chen MY (2005) SMEs and ERP key success factors, the third Management Concept and Practice Symposium Proceedings, 37–61. |
[43] | Zhang SB (2000) A study of ERP key success factors in the electronics industry (Master thesis), Private Yuan Zhi University Industrial Engineering Research Center, Taiwan Taoyuan. |
[44] | Zhang TX, Wang XY, Lin HQ (2013) An investigation of second ERP implementation key success factors in small and medium-sized enterprises - the case of S Company in responding to IFRS, 2013 International ERP Academic and Practical Seminar. Available from: http://www.xedu.biz/cerps.org.tw/downloads/2013conf_paper/C3-2.pdf. |
1. | Yue Liu, Yixian Wen, Yulan Xiao, Lichang Zhang, Shan Huang, Identification of the enterprise financialization motivation on crowding out R&D innovation: evidence from listed companies in China, 2024, 9, 2473-6988, 5951, 10.3934/math.2024291 | |
2. | Yanchi Chen, Ju Ye, Qi Shi, Wajid Khan, Does managerial myopia promote enterprises over-financialization? Evidence from listed firms in China, 2024, 19, 1932-6203, e0309140, 10.1371/journal.pone.0309140 | |
3. | Yue Liu, Shan Huang, Zirui Wang, Lichang Zhang, Research on the moderate range of enterprise financialization and R&D innovation from a nonlinear perspective, 2024, 32, 2688-1594, 1923, 10.3934/era.2024088 | |
4. | Xiao Liu, Huanxue Pan, Weixing Lin, Mengkai Wang, Qiange Zhang, Sustainable Practices and Performance of Resource-Based Companies: The Role of Internal Control, 2024, 16, 2071-1050, 1399, 10.3390/su16041399 | |
5. | Shuo Wang, Wenhong Sheng, Can Green Collaborative Innovation Enhance Corporate Resilience? An Empirical Study Based on Listed Companies in China., 2025, 24058440, e42466, 10.1016/j.heliyon.2025.e42466 |
Industry Working Experience | Using ERP Experience | ||||
Expert ID | ERP System Experience (Y/N) | 5–10 Years | > 10 Years | 5–10 Years | > 10 Years |
Expert A | Y | Y | Y | ||
Expert B | Y | Y | Y | ||
Expert C | Y | Y | Y | ||
Expert D | Y | Y | Y | ||
Expert E | Y | Y | Y |
Aspects | Guidelines | Evaluation Criteria |
Enterprise/ Organization resources (Ye and Chen, 2005) | Enterprise environmental resources (Bradley, 2008), Organizational and process improvement (Olson and Zhao, 2007), Project planning and management (Vasilash, 1997). | Top management support and commitment (Maskell, 1991), Budget support and sufficient economic resources (Shanley, 1997), Excellent information environment (West, 1998), Sufficient project resources and authorization (Wall and McKineey, 1998), Enablement of business process reengineering (Bingi et al., 1999), Clear project plan based on defined ERP capacity requirement, limited scope and focused flowchart (Laughlin, 1999), Transparency level of the overall information flow and documentation process (Huang and Lin, 2012), Standard operating procedures and institutional processes (Davenport, 1998), Ability to accelerate and shorten the operation cycle of the company (Wu and Huang, 2008), Feasible and effective project schedule (Parr and Shanks, 2000), Attention to problem-solving (Holland and Light, 1999), Establishment of the optimal cross-departmental task force (Wall and McKineey, 1998). |
System user (Zhang et al., 2013) | Users' ability (Ye and Chen, 2005), Execution process (Liu, 2003), Staff awareness (Ling, 2010). | Staff professional competence and the ability to coordinate the project (Zhang et al., 2013), Staff has ability to understand and use information (Ye and Chen, 2005), Users have basic information literacy (Shanley, 1997), Users' attitude and engagement in system implementation (Xie, 2001), Strong leadership from the project team (Parr and Shanks, 2000), Good interdepartmental communication and coordination on focused issue solution (Vasilash, 1997), Ability to placate and eliminate employee resistance to new system (Shanley, 1997), Stable project team members (Nah, 2006), Staff acceptance and agreement (Lin, 2010), Staff attitude and resistance to change (Lin, 2010), Employee morale and commitment (Lin, 2010), Trust within the organization (Lin, 2010). |
ERP technique and vendor (Zhang et al., 2013) | System design and integration capabilities (Oliver, 1999), System vendor's specialty (Bingi et al., 1999), Vendor's technical support (Lin, 1999). | User-friendly interface (Wu and Huang, 2008), System is customizable and flexible enough to be modified (Wu and Huang, 2008), System incorporates an aggressive schedule and timeliness (Ye and Chen, 2005), System can effectively integrate different companies and regions and operate in different currency systems (Huang and Lin, 2012), Provide timely information for management decision-making (Wu and Huang, 2008), Manufacturer R & D capacity in new program development (Lin, 2010), Supplier can provide integrated software and can update the software when the company is continuing developing (Huang and Lin, 2012), Provide technical assistance for rapid, effective transfer of best practice interventions (Huang and Lin, 2012), Supplier can assist with the system implementation, testing, operation, maintenance and upgrade (Huang and Lin, 2012), Maintain good interaction with the company (Shanley, 1997), Assist the company to successfully install software and hardware (Guo, 1999), Supplier can work with the company to develop internal process and management software (Huang and Lin, 2012). |
Consultant service (Ye and Chen, 2005) | Consultant service details (Liu, 2003), Consultant team specialty (Xu, 2000), Technique support (Huang and Lin, 2012). | Consultancy fees charged level (Martin, 1998), Timely response to the company requirements (Liu, 2003), Assist the company staff in training and education and technology transfer (Bingi et al., 1999), Clear and effective implementation of quality assurance (Liu, 2003), Consultant can analyze the company's past, present and future operational capacity (Davenport, 1998), Consultant have a good understanding of the nature of business and competition (Ye and Chen, 2005), Consultant has high familiarity with ERP system modules and operating procedures (Martin, 1998), Consultant have a similar experience of successfully implementing the system (Oliver, 1999), Consultant can build in cost-benefit metrics and analytical tools (Wall and McKineey 1998), Level of control in the system implementation schedules (West, 1998), Consultant can work with the project team members and understand each other (Martin, 1998), Consultant can analyze the company's current HR and economic resource allocation (Martin, 1998). |
Source:based on the literature review conducted by authors. |
Top Manager ID | Working Experience | Education Level | |||
< 5 Years | 5–10 Years | 10–15 Years | > 15 Years | ||
Manager A | Y | Master Degree | |||
Managers B–G | Y | 1 Master Degree & 5 Bachelor Degrees | |||
Managers H–I | Y | 2 Bachelor Degrees | |||
Manager J | Y | Bachelor Degree |
Tier 0 | Tier 1 | Tier 2 | Tier 3 |
Objective A | Aspect B | Guideline C | Evaluation Criteria D |
ERP Key Success Factors | Enterprise/ organization resources B1 |
Enterprise environmental resources C1 |
Top management support and commitment D1 |
Budget support and sufficient economic resources D2 | |||
Excellent information environment D3 | |||
Organizational and process improvement C2 |
Enablement of business process reengineering D 4 | ||
Standard operating procedures and institutional processes D5 | |||
Clear project plan by defined ERP capacity requirement, limited scope and focused flowchart D6 | |||
Project planning and management C3 |
Goal congruence between ERP project implementation and corporate strategy D7 | ||
Feasible and effective project schedule D8 | |||
Attention to problem-solving D9 | |||
System user B2 |
Employee competence C4 |
Professional competence and the familiarity with the project D10 | |
Staff professional competence and the ability to coordinate the project D11 | |||
Staff has ability to understand and use information D12 | |||
Execution process C5 |
Strong leadership from the project team D13 | ||
Good interdepartmental communication and coordination on focused issue solution D14 | |||
Education and training to project team members and users D15 | |||
Staff awareness C6 |
Staff acceptance and agreement D16 | ||
Staff attitude and resistance to change D17 | |||
Employee morale and commitment D18 | |||
ERP technique and vendor B3 |
System design and integration capabilities C7 |
User-friendly interface D 19 | |
Customizability and flexible for modification D20 | |||
Systems integrated with an aggressive schedule and timeliness D21 | |||
System vendor's specialty C8 |
Manufacturer R & D capacity in new program development D22 | ||
Supplier can provide integrated software and can update the software to facilitate the company's growth D23 | |||
Provide technical assistance for rapid, effective transfer of best practice interventions D24 | |||
Vendor's technical support C9 |
Supplier can assist with the system implementation, testing, operation, maintenance and upgrade D25 | ||
Good customer service after-sales and technical support D26 | |||
Maintain good interaction with the company D27 | |||
Consultant service B4 |
Consultant service details C10 |
Consultancy fees D28 | |
Timely response to the company requirements D29 | |||
Assist the company staff in training and education and technology transfer D30 | |||
Consultant team specialty C11 |
Consultants have a similar experience of successfully implementing the system D31 | ||
Consultants have a good understanding of the company's goals and strategies D32 | |||
Consultant has high familiarity with ERP system modules and operating procedures D33 | |||
Consultant technique support C12 |
Good communication and coordination skills D34 | ||
Consultant can build in cost-benefit metrics and analytical tools D 35 | |||
Level of control in the system implementation schedules D36 | |||
Source:based on the analysis conducted in this study. |
Aspects | Tier Weight | Guidelines | Tier Weight | Accumulated Weight | Accumulated Ranking | Evaluation Criteria | Tier Weight | Accumulated Weight | Overall Ranking |
Enterprise/ Organization resources | 0.569 | Enterprise environmental resources | 0.229 | 0.130 | 4 | Top management support and commitment | 0.658 | 0.086 | 3 |
Budget support and sufficient economic resources | 0.220 | 0.029 | 14 | ||||||
Excellent information environment | 0.122 | 0.016 | 21 | ||||||
Organizational and process improvement | 0.454 | 0.258 | 1 | Enablement of business process reengineering | 0.156 | 0.040 | 9 | ||
Standard operating procedures and institutional processes | 0.304 | 0.079 | 4 | ||||||
Clear project plan based on defined ERP capacity requirement, limited scope and focused flowchart | 0.540 | 0.140 | 1 | ||||||
Project planning and management | 0.317 | 0.180 | 2 | Goal congruence between ERP project implementation and corporate strategy | 0.662 | 0.119 | 2 | ||
Feasible and effective project schedule | 0.174 | 0.031 | 11 | ||||||
Attention to problem-solving | 0.164 | 0.030 | 13 | ||||||
System user | 0.202 | Employee competence | 0.131 | 0.027 | 10 | Professional competence and the familiarity with the project | 0.451 | 0.012 | 26 |
Staff professional competence and the ability to coordinate the project | 0.398 | 0.011 | 27 | ||||||
Staff has ability to understand and use information | 0.151 | 0.004 | 32 | ||||||
Execution process | 0.546 | 0.110 | 5 | Strong leadership from the project team | 0.361 | 0.040 | 10 | ||
Good interdepartmental communication and coordination on focused issue solution | 0.490 | 0.054 | 8 | ||||||
Education and training for project team members and users | 0.149 | 0.016 | 20 | ||||||
Staff awareness | 0.323 | 0.065 | 7 | Staff acceptance and agreement | 0.365 | 0.024 | 17 | ||
Staff attitude and resistance to change | 0.404 | 0.026 | 16 | ||||||
Employee morale and commitment | 0.230 | 0.015 | 24 | ||||||
ERP technique and vendor | 0.154 | System design and integration capabilities | 0.545 | 0.164 | 3 | User-friendly interface | 0.445 | 0.073 | 5 |
Customizability and flexible for modification | 0.190 | 0.031 | 12 | ||||||
Systems integrated with aggressive schedule and timeliness | 0.365 | 0.060 | 6 | ||||||
System vendor's specialty | 0.300 | 0.090 | 6 | Manufacturer R & D capacity in new program development | 0.176 | 0.016 | 22 | ||
Supplier can provide integrated software and can update the software to facilitate the company's growth | 0.221 | 0.020 | 19 | ||||||
Provide technical assistance for rapid, effective transfer of best practice interventions | 0.603 | 0.054 | 7 | ||||||
Vendor's technical support | 0.155 | 0.047 | 9 | Supplier can assist with the system implementation, testing, operation, maintenance and upgrade | 0.602 | 0.028 | 15 | ||
Good customer service after-sales and technical support | 0.208 | 0.010 | 28 | ||||||
Maintain good interaction with the company | 0.189 | 0.009 | 29 | ||||||
Consultant service | 0.075 | Consultant service details | 0.159 | 0.012 | 11 | Consultancy fees | 0.151 | 0.002 | 36 |
Timely response to the company requirements | 0.628 | 0.007 | 30 | ||||||
Assist the company staff in training and education and technology transfer | 0.221 | 0.003 | 34 | ||||||
Consultant team specialty | 0.697 | 0.052 | 8 | Consultants have a similar experience of successfully implementing the system | 0.458 | 0.024 | 18 | ||
Consultants have a good understanding of the company's goals and strategies | 0.298 | 0.015 | 23 | ||||||
Consultants have high familiarity with ERP system modules and operating procedures | 0.245 | 0.013 | 25 | ||||||
Consultant technique support | 0.145 | 0.011 | 12 | Good communication and coordination skills | 0.482 | 0.005 | 31 | ||
Consultants can build in cost-benefit metrics and analytical tools | 0.190 | 0.002 | 35 | ||||||
Level of control in the system implementation schedules | 0.327 | 0.004 | 33 | ||||||
Source: based on the analysis conducted by this study. |
Factors by Tier | Consistency Ratio |
(Tier 1) Overall factors | 0.0192 |
(Tier 2) Enterprise/ Organization resources | 0.0009 |
(Tier 2) System user | 0.0001 |
(Tier 2) ERP technique and vendor | 0.0025 |
(Tier 2) Consultant service | 0.0019 |
(Tier 3) Enterprise environmental resources | 0.0045 |
(Tier 3) Organizational and process improvement | 0.0005 |
(Tier 3) Project planning and management | 0.0024 |
(Tier 3) Employee competence | 0.0001 |
(Tier 3) Execution process | 0.0008 |
(Tier 3) Staff awareness | 0.0001 |
(Tier 3) System design and integration capabilities | 0.0002 |
(Tier 3) System vendor's specialty | 0.0011 |
(Tier 3) Vendor's technical support | 0.0001 |
(Tier 3) Consultant service details | 0.0001 |
(Tier 3) Consultant team specialty | 0.0004 |
(Tier 3) Consultant technique support | 0.0023 |
Industry Working Experience | Using ERP Experience | ||||
Expert ID | ERP System Experience (Y/N) | 5–10 Years | > 10 Years | 5–10 Years | > 10 Years |
Expert A | Y | Y | Y | ||
Expert B | Y | Y | Y | ||
Expert C | Y | Y | Y | ||
Expert D | Y | Y | Y | ||
Expert E | Y | Y | Y |
Aspects | Guidelines | Evaluation Criteria |
Enterprise/ Organization resources (Ye and Chen, 2005) | Enterprise environmental resources (Bradley, 2008), Organizational and process improvement (Olson and Zhao, 2007), Project planning and management (Vasilash, 1997). | Top management support and commitment (Maskell, 1991), Budget support and sufficient economic resources (Shanley, 1997), Excellent information environment (West, 1998), Sufficient project resources and authorization (Wall and McKineey, 1998), Enablement of business process reengineering (Bingi et al., 1999), Clear project plan based on defined ERP capacity requirement, limited scope and focused flowchart (Laughlin, 1999), Transparency level of the overall information flow and documentation process (Huang and Lin, 2012), Standard operating procedures and institutional processes (Davenport, 1998), Ability to accelerate and shorten the operation cycle of the company (Wu and Huang, 2008), Feasible and effective project schedule (Parr and Shanks, 2000), Attention to problem-solving (Holland and Light, 1999), Establishment of the optimal cross-departmental task force (Wall and McKineey, 1998). |
System user (Zhang et al., 2013) | Users' ability (Ye and Chen, 2005), Execution process (Liu, 2003), Staff awareness (Ling, 2010). | Staff professional competence and the ability to coordinate the project (Zhang et al., 2013), Staff has ability to understand and use information (Ye and Chen, 2005), Users have basic information literacy (Shanley, 1997), Users' attitude and engagement in system implementation (Xie, 2001), Strong leadership from the project team (Parr and Shanks, 2000), Good interdepartmental communication and coordination on focused issue solution (Vasilash, 1997), Ability to placate and eliminate employee resistance to new system (Shanley, 1997), Stable project team members (Nah, 2006), Staff acceptance and agreement (Lin, 2010), Staff attitude and resistance to change (Lin, 2010), Employee morale and commitment (Lin, 2010), Trust within the organization (Lin, 2010). |
ERP technique and vendor (Zhang et al., 2013) | System design and integration capabilities (Oliver, 1999), System vendor's specialty (Bingi et al., 1999), Vendor's technical support (Lin, 1999). | User-friendly interface (Wu and Huang, 2008), System is customizable and flexible enough to be modified (Wu and Huang, 2008), System incorporates an aggressive schedule and timeliness (Ye and Chen, 2005), System can effectively integrate different companies and regions and operate in different currency systems (Huang and Lin, 2012), Provide timely information for management decision-making (Wu and Huang, 2008), Manufacturer R & D capacity in new program development (Lin, 2010), Supplier can provide integrated software and can update the software when the company is continuing developing (Huang and Lin, 2012), Provide technical assistance for rapid, effective transfer of best practice interventions (Huang and Lin, 2012), Supplier can assist with the system implementation, testing, operation, maintenance and upgrade (Huang and Lin, 2012), Maintain good interaction with the company (Shanley, 1997), Assist the company to successfully install software and hardware (Guo, 1999), Supplier can work with the company to develop internal process and management software (Huang and Lin, 2012). |
Consultant service (Ye and Chen, 2005) | Consultant service details (Liu, 2003), Consultant team specialty (Xu, 2000), Technique support (Huang and Lin, 2012). | Consultancy fees charged level (Martin, 1998), Timely response to the company requirements (Liu, 2003), Assist the company staff in training and education and technology transfer (Bingi et al., 1999), Clear and effective implementation of quality assurance (Liu, 2003), Consultant can analyze the company's past, present and future operational capacity (Davenport, 1998), Consultant have a good understanding of the nature of business and competition (Ye and Chen, 2005), Consultant has high familiarity with ERP system modules and operating procedures (Martin, 1998), Consultant have a similar experience of successfully implementing the system (Oliver, 1999), Consultant can build in cost-benefit metrics and analytical tools (Wall and McKineey 1998), Level of control in the system implementation schedules (West, 1998), Consultant can work with the project team members and understand each other (Martin, 1998), Consultant can analyze the company's current HR and economic resource allocation (Martin, 1998). |
Source:based on the literature review conducted by authors. |
Top Manager ID | Working Experience | Education Level | |||
< 5 Years | 5–10 Years | 10–15 Years | > 15 Years | ||
Manager A | Y | Master Degree | |||
Managers B–G | Y | 1 Master Degree & 5 Bachelor Degrees | |||
Managers H–I | Y | 2 Bachelor Degrees | |||
Manager J | Y | Bachelor Degree |
Tier 0 | Tier 1 | Tier 2 | Tier 3 |
Objective A | Aspect B | Guideline C | Evaluation Criteria D |
ERP Key Success Factors | Enterprise/ organization resources B1 |
Enterprise environmental resources C1 |
Top management support and commitment D1 |
Budget support and sufficient economic resources D2 | |||
Excellent information environment D3 | |||
Organizational and process improvement C2 |
Enablement of business process reengineering D 4 | ||
Standard operating procedures and institutional processes D5 | |||
Clear project plan by defined ERP capacity requirement, limited scope and focused flowchart D6 | |||
Project planning and management C3 |
Goal congruence between ERP project implementation and corporate strategy D7 | ||
Feasible and effective project schedule D8 | |||
Attention to problem-solving D9 | |||
System user B2 |
Employee competence C4 |
Professional competence and the familiarity with the project D10 | |
Staff professional competence and the ability to coordinate the project D11 | |||
Staff has ability to understand and use information D12 | |||
Execution process C5 |
Strong leadership from the project team D13 | ||
Good interdepartmental communication and coordination on focused issue solution D14 | |||
Education and training to project team members and users D15 | |||
Staff awareness C6 |
Staff acceptance and agreement D16 | ||
Staff attitude and resistance to change D17 | |||
Employee morale and commitment D18 | |||
ERP technique and vendor B3 |
System design and integration capabilities C7 |
User-friendly interface D 19 | |
Customizability and flexible for modification D20 | |||
Systems integrated with an aggressive schedule and timeliness D21 | |||
System vendor's specialty C8 |
Manufacturer R & D capacity in new program development D22 | ||
Supplier can provide integrated software and can update the software to facilitate the company's growth D23 | |||
Provide technical assistance for rapid, effective transfer of best practice interventions D24 | |||
Vendor's technical support C9 |
Supplier can assist with the system implementation, testing, operation, maintenance and upgrade D25 | ||
Good customer service after-sales and technical support D26 | |||
Maintain good interaction with the company D27 | |||
Consultant service B4 |
Consultant service details C10 |
Consultancy fees D28 | |
Timely response to the company requirements D29 | |||
Assist the company staff in training and education and technology transfer D30 | |||
Consultant team specialty C11 |
Consultants have a similar experience of successfully implementing the system D31 | ||
Consultants have a good understanding of the company's goals and strategies D32 | |||
Consultant has high familiarity with ERP system modules and operating procedures D33 | |||
Consultant technique support C12 |
Good communication and coordination skills D34 | ||
Consultant can build in cost-benefit metrics and analytical tools D 35 | |||
Level of control in the system implementation schedules D36 | |||
Source:based on the analysis conducted in this study. |
Aspects | Tier Weight | Guidelines | Tier Weight | Accumulated Weight | Accumulated Ranking | Evaluation Criteria | Tier Weight | Accumulated Weight | Overall Ranking |
Enterprise/ Organization resources | 0.569 | Enterprise environmental resources | 0.229 | 0.130 | 4 | Top management support and commitment | 0.658 | 0.086 | 3 |
Budget support and sufficient economic resources | 0.220 | 0.029 | 14 | ||||||
Excellent information environment | 0.122 | 0.016 | 21 | ||||||
Organizational and process improvement | 0.454 | 0.258 | 1 | Enablement of business process reengineering | 0.156 | 0.040 | 9 | ||
Standard operating procedures and institutional processes | 0.304 | 0.079 | 4 | ||||||
Clear project plan based on defined ERP capacity requirement, limited scope and focused flowchart | 0.540 | 0.140 | 1 | ||||||
Project planning and management | 0.317 | 0.180 | 2 | Goal congruence between ERP project implementation and corporate strategy | 0.662 | 0.119 | 2 | ||
Feasible and effective project schedule | 0.174 | 0.031 | 11 | ||||||
Attention to problem-solving | 0.164 | 0.030 | 13 | ||||||
System user | 0.202 | Employee competence | 0.131 | 0.027 | 10 | Professional competence and the familiarity with the project | 0.451 | 0.012 | 26 |
Staff professional competence and the ability to coordinate the project | 0.398 | 0.011 | 27 | ||||||
Staff has ability to understand and use information | 0.151 | 0.004 | 32 | ||||||
Execution process | 0.546 | 0.110 | 5 | Strong leadership from the project team | 0.361 | 0.040 | 10 | ||
Good interdepartmental communication and coordination on focused issue solution | 0.490 | 0.054 | 8 | ||||||
Education and training for project team members and users | 0.149 | 0.016 | 20 | ||||||
Staff awareness | 0.323 | 0.065 | 7 | Staff acceptance and agreement | 0.365 | 0.024 | 17 | ||
Staff attitude and resistance to change | 0.404 | 0.026 | 16 | ||||||
Employee morale and commitment | 0.230 | 0.015 | 24 | ||||||
ERP technique and vendor | 0.154 | System design and integration capabilities | 0.545 | 0.164 | 3 | User-friendly interface | 0.445 | 0.073 | 5 |
Customizability and flexible for modification | 0.190 | 0.031 | 12 | ||||||
Systems integrated with aggressive schedule and timeliness | 0.365 | 0.060 | 6 | ||||||
System vendor's specialty | 0.300 | 0.090 | 6 | Manufacturer R & D capacity in new program development | 0.176 | 0.016 | 22 | ||
Supplier can provide integrated software and can update the software to facilitate the company's growth | 0.221 | 0.020 | 19 | ||||||
Provide technical assistance for rapid, effective transfer of best practice interventions | 0.603 | 0.054 | 7 | ||||||
Vendor's technical support | 0.155 | 0.047 | 9 | Supplier can assist with the system implementation, testing, operation, maintenance and upgrade | 0.602 | 0.028 | 15 | ||
Good customer service after-sales and technical support | 0.208 | 0.010 | 28 | ||||||
Maintain good interaction with the company | 0.189 | 0.009 | 29 | ||||||
Consultant service | 0.075 | Consultant service details | 0.159 | 0.012 | 11 | Consultancy fees | 0.151 | 0.002 | 36 |
Timely response to the company requirements | 0.628 | 0.007 | 30 | ||||||
Assist the company staff in training and education and technology transfer | 0.221 | 0.003 | 34 | ||||||
Consultant team specialty | 0.697 | 0.052 | 8 | Consultants have a similar experience of successfully implementing the system | 0.458 | 0.024 | 18 | ||
Consultants have a good understanding of the company's goals and strategies | 0.298 | 0.015 | 23 | ||||||
Consultants have high familiarity with ERP system modules and operating procedures | 0.245 | 0.013 | 25 | ||||||
Consultant technique support | 0.145 | 0.011 | 12 | Good communication and coordination skills | 0.482 | 0.005 | 31 | ||
Consultants can build in cost-benefit metrics and analytical tools | 0.190 | 0.002 | 35 | ||||||
Level of control in the system implementation schedules | 0.327 | 0.004 | 33 | ||||||
Source: based on the analysis conducted by this study. |
Factors by Tier | Consistency Ratio |
(Tier 1) Overall factors | 0.0192 |
(Tier 2) Enterprise/ Organization resources | 0.0009 |
(Tier 2) System user | 0.0001 |
(Tier 2) ERP technique and vendor | 0.0025 |
(Tier 2) Consultant service | 0.0019 |
(Tier 3) Enterprise environmental resources | 0.0045 |
(Tier 3) Organizational and process improvement | 0.0005 |
(Tier 3) Project planning and management | 0.0024 |
(Tier 3) Employee competence | 0.0001 |
(Tier 3) Execution process | 0.0008 |
(Tier 3) Staff awareness | 0.0001 |
(Tier 3) System design and integration capabilities | 0.0002 |
(Tier 3) System vendor's specialty | 0.0011 |
(Tier 3) Vendor's technical support | 0.0001 |
(Tier 3) Consultant service details | 0.0001 |
(Tier 3) Consultant team specialty | 0.0004 |
(Tier 3) Consultant technique support | 0.0023 |