
Remanufacturing industry gives an opportunity to rework defective products from a production system and make them useful again. When an industry remanufactures multiple similar types of products, every type of product goes through the same procedure repetitively. Repetition of the same procedure for similar products causes the overuse of a machine. This study investigates a flexible production system to reduce the overuse of machines for repetitive tasks. A two-stage flexible production system is considered where the common parts of multiple products are produced and remanufactured in the Stage 1. Continuing from Stage 1, the rest product-specific production of each product and remanufacturing processes are completed in Stage 2. Transportation of products uses a multiple delivery policy. This study aims to optimize the cycle time for the production process along with the production rate for Stages 1 and 2. The model is solved by a classical optimization technique and numerical results find the minimum cost of the remanufacturing system. A linear along with non-linear relationship effect of the shared-production process on the production cost are discussed. Results show that the two-stage production system with a shared-production process is cost-efficient and reduce the cycle time.
Citation: Ashish Kumar Mondal, Sarla Pareek, Biswajit Sarkar. The impact of shared-production and remanufacturing within a multi-product-based flexible production system[J]. AIMS Environmental Science, 2023, 10(2): 267-286. doi: 10.3934/environsci.2023016
[1] | Soumya Kanti Hota, Santanu Kumar Ghosh, Biswajit Sarkar . A solution to the transportation hazard problem in a supply chain with an unreliable manufacturer. AIMS Environmental Science, 2022, 9(3): 354-380. doi: 10.3934/environsci.2022023 |
[2] | Bijoy Kumar Shaw, Isha Sangal, Biswajit Sarkar . Reduction of greenhouse gas emissions in an imperfect production process under breakdown consideration. AIMS Environmental Science, 2022, 9(5): 658-691. doi: 10.3934/environsci.2022038 |
[3] | Subhash Kumar, Ashok Kumar, Rekha Guchhait, Biswajit Sarkar . An environmental decision support system for manufacturer-retailer within a closed-loop supply chain management using remanufacturing. AIMS Environmental Science, 2023, 10(5): 644-676. doi: 10.3934/environsci.2023036 |
[4] | Mowmita Mishra, Santanu Kumar Ghosh, Biswajit Sarkar . Maintaining energy efficiencies and reducing carbon emissions under a sustainable supply chain management. AIMS Environmental Science, 2022, 9(5): 603-635. doi: 10.3934/environsci.2022036 |
[5] | Richi Singh, Dharmendra Yadav, S.R. Singh, Ashok Kumar, Biswajit Sarkar . Reduction of carbon emissions under sustainable supply chain management with uncertain human learning. AIMS Environmental Science, 2023, 10(4): 559-592. doi: 10.3934/environsci.2023032 |
[6] | Benjamin Hersh, Amin Mirkouei, John Sessions, Behnaz Rezaie, Yaqi You . A review and future directions on enhancing sustainability benefits across food-energy-water systems: the potential role of biochar-derived products. AIMS Environmental Science, 2019, 6(5): 379-416. doi: 10.3934/environsci.2019.5.379 |
[7] | Soumya Kanti Hota, Santanu Kumar Ghosh, Biswajit Sarkar . Involvement of smart technologies in an advanced supply chain management to solve unreliability under distribution robust approach. AIMS Environmental Science, 2022, 9(4): 461-492. doi: 10.3934/environsci.2022028 |
[8] | Anna Lymperatou, Ioannis V. Skiadas, Hariklia N. Gavala . Anaerobic co-digestion of swine manure and crude glycerol derived from animal fat—Effect of hydraulic retention time. AIMS Environmental Science, 2018, 5(2): 105-116. doi: 10.3934/environsci.2018.2.105 |
[9] | Raj Kumar Bachar, Shaktipada Bhuniya, Santanu Kumar Ghosh, Biswajit Sarkar . Sustainable green production model considering variable demand, partial outsourcing, and rework. AIMS Environmental Science, 2022, 9(3): 325-353. doi: 10.3934/environsci.2022022 |
[10] | Atinuke Chineme, Getachew Assefa, Irene M. Herremans, Barry Wylant, Marwa Shumo, Aliceanna Shoo, Mturi James, Frida Ngalesoni, Anthony Ndjovu, Steve Mbuligwe, Mike Yhedgo . Advancing circular economy principles through wild black soldier flies. AIMS Environmental Science, 2023, 10(6): 868-893. doi: 10.3934/environsci.2023047 |
Remanufacturing industry gives an opportunity to rework defective products from a production system and make them useful again. When an industry remanufactures multiple similar types of products, every type of product goes through the same procedure repetitively. Repetition of the same procedure for similar products causes the overuse of a machine. This study investigates a flexible production system to reduce the overuse of machines for repetitive tasks. A two-stage flexible production system is considered where the common parts of multiple products are produced and remanufactured in the Stage 1. Continuing from Stage 1, the rest product-specific production of each product and remanufacturing processes are completed in Stage 2. Transportation of products uses a multiple delivery policy. This study aims to optimize the cycle time for the production process along with the production rate for Stages 1 and 2. The model is solved by a classical optimization technique and numerical results find the minimum cost of the remanufacturing system. A linear along with non-linear relationship effect of the shared-production process on the production cost are discussed. Results show that the two-stage production system with a shared-production process is cost-efficient and reduce the cycle time.
A production system with a similar type of multi-product is gaining attention nowadays. A traditional economic production quantity (EPQ) produces each type of product separately [1]. This process uses a machine multiple times for a similar process. Production of multi-products in a shared production system can reduce machine usage and can produce the generic structure of multi-product. Agarwal [2] introduced an easy grouping concept under a common order cycle to solve a multi-product supply chain. They introduced a computation method to find the optimal value of the common order cycle. Rosenblatt and Rothblum [3] presented a multi-item production management policy under a single resource capacity constraint. Aliyu and Andizani [4] examined a multi-item production-inventory system with shortages, deterministic demand, deterioration, and capacity and budget constraints. They used a linear quadratic concept to find the value of the optimal control policy. Balkhi and Foul [5] discussed a multi-product production model in finite time periods where shortages and backorders are allowed for every product. For every product, they derived optimal production and restarting times for each period. Rahmani et al. [6] investigated a two-stage capacity-based production system with uncertain demand and production costs. An initial robust schedule was used by them. Chiu et al. [7] proposed a production model to find the production and shipment decisions, simultaneously, with the rework process. They considered a single-stage production process without involving the common intermediate part. Their outcomes helped managers to understand and control the effects of different system parameters on the optimal production-shipment policy. Additional studies related to multi-product production-inventory systems are found in the literature [8].
The evolution of industries over the past century has been characterized by the integration of supply chains (SCs), titled a supply chain integration (SCI) [9]. The SCI activities within an organization, correspond to the suppliers, the customers and the SC levels [10]. In other words, the SCI is an organizational process to integrate the suppliers, the customers, and the internal functional units to optimize the SC's total performance of the SC [11]. Rosenzweig et al., [12] further defined the SCI as the linkages among various SC elements. Many authors discussed the SCI as a common place for SCs [13]. These integration definitions have undergone various modifications owing to research from different perspectives. The SCI aims at coordinating processes in the SCs as an important competitive advantage over competitors [14] and [15]. The experts of the supply chain management (SCM) believe that the integration leads to higher performance for SC levels [16,17,18]. Generally, the global competition and the demand for better customer services have significantly increased the needs for SCI among the companies. The most well-established frameworks for studying SC relate to lot-sizing problems [19].
Gharaei et al. [20] proposed the growth patterns for all dead and live-grown items, along with mortality and survival probabilities. Gharaei et al. [21] developed and optimized a lot-sizing policy in an integrated EPQ model with partial backorders and re-workable products. They considered linear and fixed backordering costs. Gharaei et al. [22] designed and optimized an integrated four-level SC, which contained a supplier, a producer, a wholesaler, and multiple retailers. Gharaei et al. [23] provided a new generation of inventory models, entitled economic growing quantity (EGQ), which focused on growing items of agricultural industries, such as fisheries, poultry, and livestock. Gharaei et al. [24] addressed the optimum number of stockpiles and the economic period length for inventories. Amjadian et al. [25] designed an integrated five-level SC, which contained a supplier, a producer, a wholesaler, multiple retailers, and a collector. Accordingly, a closed-loop supply chain (CLSC) with multi-stage products were designed by them with respect to the green production principles and quality control (QC) policy under backlogged and lost sale. Taleizadeh et al. [26] described optimal decisions and operational strategies in a logistics network considering two capital-constrained manufacturers. They produced products of different qualities, and sold them to a retailer with deterministic demand over a specific period. Gharaei et al. [27] proposed a multi-product, multi-buyer SC model with stochastic constraints. Moreover, the model differentiated between the holding costs for financial and non-financial components, in which the first included the investment in the market, and the second included the cost for physical storage, movement, and insurance of products.
In multi-item production system, if multiple products share a common intermediate part, vendors can be interested in evaluating a two-stage production scheme. The first-stage makes common intermediate parts and the second stage produces end products to reduce overall system costs and shorten the replenishment cycle time. Reduce costs along with shortening the refill cycle period. Gerchak et al. [28] created a model for an arbitrary number of products with a normal demand distribution. They explained the service level measure where the production of common components might be required. Garg and Tang [29] discussed that there are differences among similar types of multiple products. They created two replicas of products with a difference of more than one position. They decided on necessary conditions when one type of delayed differentiation was more beneficial than the other. They found that variations in demand and lead times have significant effects on determining which point of differentiation should be delayed. Graman [30] explained a two-product, single-term, order-up-to cost model to decide inventory levels of end products and postponement capacity. Non-linear programming was chosen to decide the optimal solutions to inventory levels and capacity that minimized the system costs. The study indicated that altering product value, holding cost, cost of postponement, packaging cost, and fill rate reduced expected total cost and increased postponement capacity. Other studies addressed various aspects of the multi-product production management system [31]. It is inevitable to produce defective items due to various uncontrolled factors in the production process. Quality assurance, quality inspections, rework, and elimination of imperfect items, are studied in several studies [32]. In contrast to a continuous review model, a period review model is important within a multi-product-based production system. Several aspects of the periodic review model and multi-shipment issues are discussed in the literature too [33].
Mukherjee et al. [34] estimated maximum product flow within a cross-dock. Mridha et al. [35] discussed a green product manufacturing system but did not discuss a multi-product system. Habib et al. [36] discussed a green product manufacturing system where raw materials were collected from multi-type waste products. Sarkar et al. [37] proposed a model that aimed to reduce waste by reworking defective products and maximizing profit. Saxena et al. [38] proposed an SC model for a single type of eco-designed product and solved the model using the Stackelberg-Nash game policy. Bachar et al. [39] described a production model where partial outsourcing of products was allowed to remove shortages from the system. Discussed studies formulated production and SC model single type of products without shared-production facility. This model expands on the earlier work of Chiu [7] for a period-review model flexible production system (Figure 1).
The proposed model describes a flexible production system integrated with shared-production techniques and remanufacturing. The flexible production system has a single machine. The vendor's annual demand is for number of different products. These customized items are made using a two-stage shared-production system. Stage 1 makes only common components, and Stage 2 produces the final product with the rest of the components within sequence . This two-stage production system has a common cycle time. The study aims to reduce machine usage by reducing the replenishment period and optimizing production quantity. The common parts are produced at the rate of in Stage 1. Then, different customized products are assembled (Figure 1) at a production rate . Here, and indicates the shared-production process of Stage 1.
Material and development costs of each product are added in unit production cost of product for production and remanufacturing as . The production process at each Stage randomly produce portion of defective products at the rate , where = . Production rate of Stage 2 is greater than (), i.e., , i.e., . All defective products are remanufactured in each stage. The remanufacturing process begins at a rate as soon as the production process ends in both stages (Figure 2).
Common components of all products are manufactured in Stage 1 in time and remanufactured imperfect products at time . After completion of production and remanufacturing in Stage 1, products are ready for the Stage 2. Total inventory from shared-production facility is represented in Figure 3. Production in Stage 2 happens in succession order, from to . In Stage 2, customized production of all products takes time for product and remanufacturing of finished products requires times. Then, products are sent for delivery in number of shipments at time (Figure 4). The supply level of finished products from the flexible production system is represented in Figure 4.
Index | |
Number of products represents shared-production of all products | |
Decision | variables |
Production cycle length (time unit) | |
Number of shipments of finished products in each cycle (integer) | |
Production rate of product (units/time unit) | |
Remanufacturing rate for product (units/time unit) | |
Parameter | |
Market demand of product (units/time unit) | |
Production lot size of product finished product (units/cycle) | |
Production setup cost of product ($/setup) | |
Unit production cost of product ($/unit) | |
Unit material cost of product for production ($/unit) | |
Unit material cost of product for remanufacturing ($/unit) | |
Unit development cost of product for production ($/unit) | |
Unit development cost of product for remanufacturing ($/unit) | |
Unit holding cost of new produced product ($/unit/unit time) | |
Unit holding cost per remanufactured item ($/unit/unit time) | |
Unit holding cost for storing finished product ($/unit/unit time) | |
Unit holding cost for safety stocks for product ($/unit/unit time) | |
Unit remanufacturing cost for product ($/unit) | |
Production uptime for product (time unit) | |
Remanufacturing time for product (time unit) | |
Delivery time of product (time unit) | |
Inventory level of common components for product (units) | |
Perfect quality item at the end of the production up time (units) | |
Perfect quality items at the end of remanufacturing process (units) | |
Random defective rate of product in Stage 1 | |
Random defective rate of product in Stage 2 | |
Defective percentage of product in production | |
Fixed delivery cost per shipment for product ($/shipment) | |
Unit delivery cost per unit product ($/unit) | |
Fixed interval of time between each of shipment of finished item during | |
(time unit) | |
On-hand inventory level of perfect quality items at any time (units) | |
On-hand inventory level of imperfect items at any time (units) | |
On-hand inventory level of finished product at any time (units) | |
Leftover finished product in each (units) | |
Number of delivered finished product in each shipment (units) | |
Completion rate of common component of products as compared to the finished | |
product | |
scaling parameter of unit production cost | |
Total cost of the production system ($) | |
Expected production cycle length (time unit) | |
Expected total cost ($/cycle) |
This section describes the mathematical modeling and total cost analysis of these study.
A two-stage flexible production model produces distinct multi-product with annual market demand . The production cycle is (Figure 1)
(5.1) |
Stage 1 produces common components of all products in a lot size . It depends on the production batch of product . Then, the following (Figure 1) equations are found:
(5.2) |
(5.3) |
(5.4) |
(5.5) |
(5.6) |
(5.7) |
(5.8) |
In Stage 2 (), the following equations are found from Figures 2 to 4.
(5.9) |
(5.10) |
(5.11) |
(5.12) |
(5.13) |
(5.14) |
(5.15) |
(5.16) |
Different costs for the two-stage flexible production system are developed as follows.
Total setup cost is the sum of the setup amount for Stage 1 and Stage 2 for item in a production cycle. Therefore, total setup cost for the production process can be formulated as
(5.17) |
Unit production cost depends on metrical cost, development cost, and production rate, and remanufacturing rate of product . Thus, the unit production cost of the product for both Stages are given by
(5.18) |
Imperfect products are produced through the production process of both stages for the product . Those imperfect products are remanufactured right after the production process are finished. The corresponding remanufacturing cost is
(5.19) |
To overcome the stock out situation, some safety stock is required. Imperfect products are not send to the market as new products. The manufacturer uses the remanufactured products as safety stock to avoid shortages.
(5.20) |
IHC is used for holding common components, both manufactured and remanufactured product , throughout and (Figures 1 and 2). Thus, the inventory holding cost is
(5.21) |
In Stage 2, IHCF is used for holding the production of customized product (Figure 3). The associative cost is written as
(5.22) |
IHCI is used for holding imperfect products after remanufacturing until the time . The corresponding holding cost is
(5.23) |
Total perfect customized products after production and remanufacturing are stored until the time for product . Besides, number of reworked items are stored until time . Total holding cost for perfect customized products is
(5.24) |
Defective customized product is stored in every production cycle until the production up time . HCDIis given as follows:
(5.25) |
Thus, the average holding cost of customized new items at the end of the production up time is HCMQ, which can be expressed as
(5.26) |
After finishing the production in two-stages, all finished products are stored for distribution. Then, products are sent in shipments. After sending product in shipment, other products are still stored. Thus, SHC is used to hold finished product after production (Figure 4). Associative stock holding cost is
(5.27) |
After Stage 2, finished products are sent to the market in number of shipments. FVD is used for fixed transportation cost and IHC is used for variable transportation cost in . Corresponding transportation cost is
(5.28) |
The total cost () of the flexible production system is , which can be written as
(5.29) |
(5.30) |
This is a period review model, i.e., inventory is checked in a certain time period. Substituting Eqs (5.1) to (5.16) in Eq (5.30), expected total cost () for number of products per cycle can be obtained as below.
(5.31) |
Eq (5.31) states the expected total cost of the proposed production system. There are four decision variables , and . The paper gives a unique solution to the problem and finds the best strategy for the flexible production system.
A classical optimization technique is used to obtain the total cost . Solutions of decision variables are found by using first order derivatives. The convex nature of the objective function in Eq (5.31) are proved by the Hessian matrix. First order partial derivatives of Eq (5.31) with respect to and are given below.
(6.1) |
(6.2) |
(6.3) |
(6.4) |
(6.5) |
(6.6) |
(6.7) |
(6.8) |
(6.9) |
(6.10) |
(6.11) |
(6.12) |
(6.13) |
(6.14) |
First order derivatives in Eqs (6.1), (6.6), (6.10), and (6.13) give unique solutions after equating the equations to zero (necessary condition of classical optimization). Thus, unique solutions , and are
(6.15) |
(6.16) |
(6.17) |
(6.18) |
[See Appendix 1 for all the values]
The following proposition proves that the cost of the flexible production system is a global minimum.
Proposition: Expected total cost of the production system in Eq (5.31) has a global minimum value at , and if the values principal minors of order one (), two (), three (), and four () of the fourth order Hessian matrix are greater than zero.
Proof: The Hessian matrix of order four can be written as
The first order principal minor is
.
The first order principal minor is
.
The second order principal minor is
.
The third order principal minor is
.
The fourth principal minor is
.
Therefore, one can conclude that the unique solutions of the objective function provides a global minimum cost.
The numerical examples are provided to investigate the outcomes of the mathematical model. Five distinct products are produced with a common component manufacturing rate . Associative input data are taken from Chiu et al. [7]. Annual demand of five products are = 3000 units/year, = 3200 units/year, = 3400 units/year, = 3,600 units/year, and = 3800 units/year. A linear relationship is assumed for these relevant manufacturing rates. The relationship between the relevant amount of the common components and the participation rate can be linear or nonlinear. All cases are investigated in the following subsections.
The correlation between the common components production and the customized production of products is linear with the participation rate = 0.5. Setup cost of Stage 1 () = $8500/setup, remanufacturing cost of Stage 1 () = $25/unit, holding cost () = $5/unit/unit time, holding cost for safety stock cost for Stage 1 () = $5/unit/unit time. Unit holding cost = $10/unit/unit time, = $15/unit/unit time, = $20/unit/unit time, = $25/unit/unit time, and = $30/unit/unit time. Holding cost for remanufactured products for Stage 1 () = $15/unit/unit time. Setup cost for Stage 2 are = $8500/setup, = $9000/setup, = $9500/setup, = $10,000/setup, = $10,500/setup. Random defective rate in Stage 1 follows uniform distribution [0, 0.04].
. Random defective rate in Stage 2 follows uniform distribution [0, 0.01], [0, 0.06], [0, 0.11], [0, 0.16], and [0, 0.21]. Unit remanufacturing costs of Stage 2 are = $25/unit, = $30/unit, = $35/unit, = $40/unit, and = $45/unit. . Unit holding cost of remanufactured product for Stage 2 are = $30/unit/unit time, = $35/unit/unit time, = $40/unit/unit time, = $45/unit/unit time, and = $50/unit/unit time. Fixed delivery cost per shipment are = $1800/shipment, = $1900/shipment, = $2000/shipment, = $2100/shipment, and = $2200/shipment. Unit variable delivery cost are = $0.1/unit, = $0.2/unit, = $0.3/unit, = $0.4/unit, and = $0.5/unit. Holding cost of finished product after Stage 2 are = $70/unit/unit time, = $75/unit/unit time, = $80/unit/unit time, = $85/unit/unit time, and = $90/unit/unit time. Holding cost of safety stock for Stage 2 are = $10/unit/unit time, = $15/unit/unit time, = $20/unit/unit time, = $25/unit/unit time, and = $30/unit/unit time.
Annual demand for common components of products is = 17,000 units, which is obtained by applying Eqs (5.2) and (5.3). Then, by using Eqs (6.15) to (6.18), the optimum shipment number is obtained as = 4, optimum production cycle time = 0.6785 years, optimum production rate of Stage 1 unit/year, 112,258 unit/year, = 116,066 unit/year, = 120,000 unit/year, = 124,068 unit/year, and = 128,276 units unit/year, optimum remanufacturing rate of of Stage 2 unit/year, = 89,806 units/year, = 92,852 units/year, = 96,000 units/year, = 99,254 units/year, and = 102,621 units/year and the expected total cost is = $107,471,000/cycle. When the participation rate rises, the total cost decreases 3.76% at = 0.5 (total cost decreases from $111,511,910/cycle () to $107,471,000/cycle). These analytic results show that the expected total cost is a significantly useful investigation for manufacturers who produce multiple items through a shared-production facility. As the participation rate rises, the optimum cycle period reduces significantly. The optimum cycle period is decreased by 25.5% at = 0.5 (declines from 0.8515 years () to 0.6785 years). Results indicate that the proposed two-stage multi-product flexible production system provides a reduced cycle length than with global minimum cost.
This investigation examines the nonlinear relationship between shared-production and customized production with a participation rate . Hence it has a more production rate than a linear participation rate. Using the new relation, parametric values are = $40/unit, = $13,493/setup, = = $8/unit time, = $24/unit/unit time. Other parameters remain identical as expressed in Subsection 7.1. [0, 0.04]. Therefore, = $3507/setup, $4007/setup, $4507/setup, $5007/setup, and $5507/setup. = $10/unit, $15/unit, $20/unit, $25/unit, and $30/unit, and follows a uniform distribution with the interval [0, 0.01], [0, 0.06], [0, 0.11], [0, 0.16], and [0, 0.21], for five products, respectively.
If is the nonlinear relation, then = = $63/unit. Using Eqs (6.15) to (6.18) and (5.31), one can get the optimum numeral values of the shipment = 4, optimum production cycle time = 0.6005 (years), optimum production rate = 101,821 unit/year, = 105,272 unit/year, = 109,518 unit/year, = 113,233 unit/year, = 117,072 unit/year, = 125,146 unit/year, optimum remanufacturing rate = 83,659 unit/year, = 87,614 unit/year, = 90,586 unit/year, = 93,657 unit/year, = 96,832 unit/year, = 100,117 unit/year, and the expected total cost is = $104,837,961/cycle. For the non-linear relationship of , when increases, total cost decreases and it decreases by 2.45% (i.e., the total cost reduces from $107,471,000/cycle for = 0.5, to $104,837,961/cycle) correlated to the initial linear occurrence. For the nonlinear case, optimum cycle time decreases by 13.20% than the linear relationship = 0.5 (it reduces from 0.6785 years to 0.5889 years). Hence, it shows that the proposed two-stage multi-product flexible production system is significantly useful for manufacturers for a short replenishment cycle. The manufacturer can provide multiple products with less cycle time. The analytic outcomes reveal that the shared-production has a higher cost than the customized production system. Besides, a nonlinear participation provides less system cost than a linear relation. But, the optimum cycle period reduces significantly for a non-linear participation rate.
The managers aim to achieve a less cost-sensitive production system such that the system cost becomes low. In a high price-sensitive system, market demand decreases with a few price increases. The risk of borrowing from the online platform increases for high-price-sensitive products. Besides, a long cycle time can increase the risk of lost sales for a cost-sensitive system. Thus, a shared-production facility along with a flexible production system solve the problem by adjusting production and remanufacturing rate within a reduced cycle time. Thus, industry managers can reduce the risk of lost sales due to a flexible production system.
A shared-production facility-based flexible production was discussed where multi-products were produced. The production system was a two-stage facility where each stage had a production and remanufacturing process. Multi-products were produced in the production process and imperfect products were remanufactured after finishing the production process. Both the production and remanufacturing processes had a single flexible machine. Thus, the shared production helped to produce common components of all products in Stage 1 and Stage 2 finished the rest. Results showed that the participation ratio of shared-production in the production process had a major impact on the system's cost and production cycle time. If the production cost of Stage 1 and Stage 2 became independent of one another, then the system cost was maximum. If the production cost of Stage 1 is linearly dependent on Stage 2, then the production cost of Stage 1 became less than Stage 2, and both the cycle time along with system cost were reduced. But, the maximum reduction in cost and cycle time happened when the relation became non-linear. The flexible production system supported the whole process as the reduction of cycle time implies a fast production process in less amount of time. Adjustment of production and remanufacturing rate of the flexible production system helped the manager to decide on the new reduced cycle time. The present model developed a flexible production model by considering simultaneous scheduling and lot-sizing with a single machine. This study can be extended using parallel flexible machines [40]. The study can be extended for a supply chain scenario with multiple buyers. Moreover, consideration of uncertainty within the market demand will make the model more practical. Instead of linear relation [41], future research can be conducted using nonlinear control theory techniques [42,43]. Environmental issue of carbon emissions can be considered within the proposed system [44].
This research is not funded through any source.
There are no conflicts of interest.
[1] |
Mishra U, Wu JZ, Sarkar B (2020) A sustainable production-inventory model for a controllable carbon emissions rate under shortages. J Clean Prod 256: 120268. https://doi.org/10.1016/j.jclepro.2020.120268 doi: 10.1016/j.jclepro.2020.120268
![]() |
[2] |
Aggarwal V (1984) Grouping multi-item inventory using common cycle periods. Eur J Oper Res 17: 369–372. https://doi.org/10.1016/0377-2217(84)90132-2 doi: 10.1016/0377-2217(84)90132-2
![]() |
[3] |
Rosenblatt MJ, Rothblum UG (1990) On the single resource capacity problem for multi-item inventory systems. Oper Res 38: 686–693. https://doi.org/10.1287/opre.38.4.686 doi: 10.1287/opre.38.4.686
![]() |
[4] |
Aliyu MDS, Andijani AA (1999) Multi-item-multi-plant inventory control of production systems with shortages/backorders. Int J Syst Sci 30: 533–539. https://doi.org/10.1080/002077299292272 doi: 10.1080/002077299292272
![]() |
[5] | Balkhi ZT, Foul A (2009) A multi-item production lot size inventory model with cycle dependent parameters. Int J Math Model Meth Appl Sci 3: 94–104. |
[6] |
Rahmani D, Ramezanian R, Fattahi P, et al. (2013) A robust optimization model for multi-product two stage capacitated production planning under uncertainty. Appl Math Model 37: 20–21, 8957–8971. https://dio.org/10.1016/j.apm.2013.04.016 doi: 10.1016/j.apm.2013.04.016
![]() |
[7] |
Chiu YSP, Chiang KW, Chiu SW, et al. (2016) Simultaneous determination of production and shipment decisions for a multi-product inventory system with a rework process. Adv Prod Eng Manag 11: 141–151. https://doi.org/10.14743/apem2016.2.216 doi: 10.14743/apem2016.2.216
![]() |
[8] |
Padiyar SVS, Vandana, Bhagat N, et al. (2022) Joint replenishment strategy for deteriorating multi-item through multi-echelon supply chain model with imperfect production under imprecise and inflationary environment. RAIRO Oper Res 56(4): 3071-3096. https://doi.org/10.1051/ro/2022071 doi: 10.1051/ro/2022071
![]() |
[9] |
Hoetker G, Swaminathan A, Mitchell W (2007) Modularity and the impact of buyer–supplier relationships on the survival of suppliers. Manag Sci 53: 178–191. https://doi.org/10.1287/mnsc.1060.0630 doi: 10.1287/mnsc.1060.0630
![]() |
[10] |
Sarkar B, Takeyeva D, Guchhait R, et al. (2022) Optimized radio-frequency identification system for different warehouse shapes. Know Based Syst 258: 109811. https://doi.org/10.1016/j.knosys.2022.109811 doi: 10.1016/j.knosys.2022.109811
![]() |
[11] |
Frohlich MT, Westbrook R (2001) Arcs of integration: An international study of supply chain strategies. J Oper Manag 19: 185–200. https://doi.org/10.1016/S0272-6963(00)00055-3 doi: 10.1016/S0272-6963(00)00055-3
![]() |
[12] |
Rosenzweig ED, Roth AV, Dean, GV (2003) Theinfluence of an integration strategy on competitive capabilities and business performance: An exploratory study of consumer product manufacturers. J Oper Manag 21: 437–456. https://doi.org/10.1016/S0272-6963(03)00037-8 doi: 10.1016/S0272-6963(03)00037-8
![]() |
[13] |
Childerhouse P, Towill DR (2011) Arcs of supply chain integration. Int J Prod Res 49: 7441–7468. https://doi.org/10.1080/00207543.2010.524259 doi: 10.1080/00207543.2010.524259
![]() |
[14] |
Christopher M, Peck H, Towill D (2006) A taxonomy for selecting global supply chain strategies. Int J Logis Manag 17: 277–287. https://doi.org/10.1108/09574090610689998 doi: 10.1108/09574090610689998
![]() |
[15] |
Pamela D, Pietro R (2011) Supply chain integration and efficiency performance: A study on the interactions between customer and supplier integration. Int J Supply Chain Manag 16: 220–230. https://doi.org/10.1108/13598541111139044 doi: 10.1108/13598541111139044
![]() |
[16] |
Singh PJ, Power D (2009) The nature and effectiveness of collaboration between firms, their customers and suppliers: A supply chain perspective. Int J Supply Chain Manag 14: 189–200. https://doi.org/10.1108/13598540910954539 doi: 10.1108/13598540910954539
![]() |
[17] |
Van der Vaart T, van Donk DP (2008) A critical review of survey-based research in supply chain integration. Int J Prod Econ 111: 42–55. https://doi.org/10.1016/j.ijpe.2006.10.011 doi: 10.1016/j.ijpe.2006.10.011
![]() |
[18] |
Ou CS, Liu FC, Hung YC, et al. (2010) A structural model of supply chain management on firm performance. Int J Oper Pro Manag 30: 526–545. https://doi.org/10.1108/01443571011039614 doi: 10.1108/01443571011039614
![]() |
[19] |
Ullah M, Sarkar B (2020) Recovery-channel selection in a hybrid manufacturing-remanufacturing production model with RFID and product quality. Int J Prod Econ 219: 360-374. https://doi.org/10.1016/j.ijpe.2019.07.017 doi: 10.1016/j.ijpe.2019.07.017
![]() |
[20] |
Gharaei A, Almehdawe E (2021) Optimal sustainable order quantities for growing items. J Clean Prod, 307: 127216. http://doi.org/10.1016/j.jclepro.2021.127216 doi: 10.1016/j.jclepro.2021.127216
![]() |
[21] |
Gharaei A, Shekarabi SAH, Karimi M (2021) Optimal lot-sizing of an integrated EPQ model with partial backorders and re-workable products: an outer approximation. Int J Syst Sci: Oper Logis 2021: 1–17. https://doi.org/10.1080/23302674.2021.2015007 doi: 10.1080/23302674.2021.2015007
![]() |
[22] |
Gharaei A, Amjadian A, Shavandi A (2021) An integrated reliable four-level supply chain with multi-stage products under shortage and stochastic constraints. Int J Syst Sci: Oper Logis 2021: 1–22. https://doi.org/10.1080/23302674.2021.1958023 doi: 10.1080/23302674.2021.1958023
![]() |
[23] |
Gharaei A, Almehdawe E (2020) Economic growing quantity. IJPE 223: 107517. https://doi.org/10.1016/j.ijpe.2019.107517 doi: 10.1016/j.ijpe.2019.107517
![]() |
[24] |
Gharaei A, Amjadian A, Amjadian A, et al. (2022) An integrated lot-sizing policy for the inventory management of constrained multi-level supply chains: null-space method. Int J Syst Sci: Oper Logis 2022: 1–14. https://doi.org/10.1080/23302674.2022.2083254 doi: 10.1080/23302674.2022.2083254
![]() |
[25] |
Amjadian A, Gharaei A (2021) An integrated reliable five-level closed-loop supply chain with multi-stage products under quality control and green policies: generalised outer approximation with exact penalty. Int J Syst Sci: Oper Logis 9: 429-449. 10.1080/23302674.2021.1919336 doi: 10.1080/23302674.2021.1919336
![]() |
[26] |
Taleizadeh A, Safaei AZ, Bhattacharya A, et al. (2022) Onlinepeer-to-peerlendingplatformandsupplychain financedecisionsandstrategies. Ann Oper Res 315: 397-427. https://doi.org/10.1007/s10479-022-04648-w doi: 10.1007/s10479-022-04648-w
![]() |
[27] |
Gharaei A, Karimi M, Shekarabi SAH (2018) An integrated multi-product multi-buyer supply chain under the penalty, green, and VMI-CS policies: OA/ER/AP algorithm. Appl Math Model 69: 223–254. https://doi.org/10.1016/j.apm.2018.11.035 doi: 10.1016/j.apm.2018.11.035
![]() |
[28] |
Gerchak Y, Magazine MJ, Gamble BA (1988) Component commonality with service level requirements. Manag Sci 34: 753–760. https://doi.org/10.1287/mnsc.34.6.753 doi: 10.1287/mnsc.34.6.753
![]() |
[29] |
Garg A, Tang CS (1997) On postponement strategies for product multiple points of differentiation. IIE Trans 29: 641–650. https://doi.org/10.1080/07408179708966374 doi: 10.1080/07408179708966374
![]() |
[30] |
Graman GA (2010) A partial-postponement decision cost model. Eur J Oper Res 201: 34–44. 10.1016/j.ejor.2009.03.001 doi: 10.1016/j.ejor.2009.03.001
![]() |
[31] |
Collier DA (1982) Aggregate safety stock levels and component part commonality. Manag Sci 28: 1296–1303. https://doi.org/10.1287/mnsc.28.11.1296 doi: 10.1287/mnsc.28.11.1296
![]() |
[32] |
Mishra U, Wu JU, Sarkar B (2021) Optimum sustainable inventory management with backorder and deterioration under controllable carbon emissions. J Clean Prod 279: 123699. https://doi.org/10.1016/j.jclepro.2020.123699 doi: 10.1016/j.jclepro.2020.123699
![]() |
[33] |
Schwarz LB (1973) A simple continuous review deterministic one-warehouse N-retailer inventory problem. Manag Sci 19: 555–566. https://doi.org/10.1287/mnsc.19.5.555 doi: 10.1287/mnsc.19.5.555
![]() |
[34] |
Mukherjee T, Sangal I, Sarkar B, et al. (2022) Mathematical estimation for maximum flow of goods within a cross-dock to reduce inventory. Math Biosci Eng 19(12): 13710-13731. 10.3934/mbe.2022639 doi: 10.3934/mbe.2022639
![]() |
[35] |
Mridha B, Pareek S, Goswami A, et al. (2023) Joint effects of production quality improvement of biofuel and carbon emissions towards a smart sustainable supply chain management. J Clean Prod 386: 135629. https://doi.org/10.1016/j.jclepro.2022.135629 doi: 10.1016/j.jclepro.2022.135629
![]() |
[36] |
Habib MS, Omair M, Ramzan MB, et al. (2022) A robust possibilistic flexible programming approach toward a resilient and cost-efficient biodiesel supply chain network. J Clean Prod 366: 132752. https://doi.org/10.1016/j.jclepro.2022.132752 doi: 10.1016/j.jclepro.2022.132752
![]() |
[37] |
Sarkar B, Joo J, Kim Y, et al. (2022) Controlling defective items in a complex multi-phase manufacturing system. RAIRO OR 56. https://doi.org/10.1051/ro/2022019 doi: 10.1051/ro/2022019
![]() |
[38] |
Saxena N, Sarkar B, Wee HM, et al. (2023) A reverse logistics model with eco-design under the Stackelberg-Nash equilibrium and centralized framework. J Clean Prod 334: 129977. https://doi.org/10.1016/j.jclepro.2022.135789 doi: 10.1016/j.jclepro.2022.135789
![]() |
[39] |
Bachar RK, Bhuniya S, Ghosh SK, et al. (2022) Controllable energy consumption in a sustainable smart manufacturing model considering superior service, flexible demand, and partial outsourcing. Mathematics 10(23): 4517. https://doi.org/10.3390/math10234517 doi: 10.3390/math10234517
![]() |
[40] |
Moon I, Yun WY, Sarkar B (2022) Effects of variable setup cost, reliability, and production costs under controlled carbon emissions in a reliable production system. Europ J Indust Eng 16(4): 371-397. https://doi.org/10.1504/EJIE.2022.123748 doi: 10.1504/EJIE.2022.123748
![]() |
[41] |
Ponte B, Wang X, de la Fuente D, et al. (2017) Exploring nonlinear supply chains: The dynamics of capacity constraints. Int J Prod Res 55: 4053–4067. https://doi.org/10.1080/00207543.2016.1245884 doi: 10.1080/00207543.2016.1245884
![]() |
[42] |
Li Q, He QM, Wu X (2016) Timing order fulfillment of capital goods under a constrained capacity. Ann Oper Res 241: 431–456. https://doi.org/10.1007/s10479-013-1311-x doi: 10.1007/s10479-013-1311-x
![]() |
[43] |
Spiegler VL, Potter AT, Naim MM, et al. (2016) The value of nonlinear control theory in investigating the underlying dynamics and resilience of a grocery supply chain. Int J Prod Res 54: 265–286. https://doi.org/10.1080/00207543.2015.1076945 doi: 10.1080/00207543.2015.1076945
![]() |
[44] |
Sarkar B, Ganguly B, Pareek S, et al. (2022) A three-echelon green supply chain management for biodegradable products with three transportation modes. Comp Indust Eng 174: 108727. https://doi.org/10.1016/j.cie.2022.108727 doi: 10.1016/j.cie.2022.108727
![]() |
1. | Biswajit Sarkar, Bikash Koli Dey, Is online-to-offline customer care support essential for consumer service?, 2023, 75, 09696989, 103474, 10.1016/j.jretconser.2023.103474 |
Index | |
Number of products represents shared-production of all products | |
Decision | variables |
Production cycle length (time unit) | |
Number of shipments of finished products in each cycle (integer) | |
Production rate of product (units/time unit) | |
Remanufacturing rate for product (units/time unit) | |
Parameter | |
Market demand of product (units/time unit) | |
Production lot size of product finished product (units/cycle) | |
Production setup cost of product ($/setup) | |
Unit production cost of product ($/unit) | |
Unit material cost of product for production ($/unit) | |
Unit material cost of product for remanufacturing ($/unit) | |
Unit development cost of product for production ($/unit) | |
Unit development cost of product for remanufacturing ($/unit) | |
Unit holding cost of new produced product ($/unit/unit time) | |
Unit holding cost per remanufactured item ($/unit/unit time) | |
Unit holding cost for storing finished product ($/unit/unit time) | |
Unit holding cost for safety stocks for product ($/unit/unit time) | |
Unit remanufacturing cost for product ($/unit) | |
Production uptime for product (time unit) | |
Remanufacturing time for product (time unit) | |
Delivery time of product (time unit) | |
Inventory level of common components for product (units) | |
Perfect quality item at the end of the production up time (units) | |
Perfect quality items at the end of remanufacturing process (units) | |
Random defective rate of product in Stage 1 | |
Random defective rate of product in Stage 2 | |
Defective percentage of product in production | |
Fixed delivery cost per shipment for product ($/shipment) | |
Unit delivery cost per unit product ($/unit) | |
Fixed interval of time between each of shipment of finished item during | |
(time unit) | |
On-hand inventory level of perfect quality items at any time (units) | |
On-hand inventory level of imperfect items at any time (units) | |
On-hand inventory level of finished product at any time (units) | |
Leftover finished product in each (units) | |
Number of delivered finished product in each shipment (units) | |
Completion rate of common component of products as compared to the finished | |
product | |
scaling parameter of unit production cost | |
Total cost of the production system ($) | |
Expected production cycle length (time unit) | |
Expected total cost ($/cycle) |
Index | |
Number of products represents shared-production of all products | |
Decision | variables |
Production cycle length (time unit) | |
Number of shipments of finished products in each cycle (integer) | |
Production rate of product (units/time unit) | |
Remanufacturing rate for product (units/time unit) | |
Parameter | |
Market demand of product (units/time unit) | |
Production lot size of product finished product (units/cycle) | |
Production setup cost of product ($/setup) | |
Unit production cost of product ($/unit) | |
Unit material cost of product for production ($/unit) | |
Unit material cost of product for remanufacturing ($/unit) | |
Unit development cost of product for production ($/unit) | |
Unit development cost of product for remanufacturing ($/unit) | |
Unit holding cost of new produced product ($/unit/unit time) | |
Unit holding cost per remanufactured item ($/unit/unit time) | |
Unit holding cost for storing finished product ($/unit/unit time) | |
Unit holding cost for safety stocks for product ($/unit/unit time) | |
Unit remanufacturing cost for product ($/unit) | |
Production uptime for product (time unit) | |
Remanufacturing time for product (time unit) | |
Delivery time of product (time unit) | |
Inventory level of common components for product (units) | |
Perfect quality item at the end of the production up time (units) | |
Perfect quality items at the end of remanufacturing process (units) | |
Random defective rate of product in Stage 1 | |
Random defective rate of product in Stage 2 | |
Defective percentage of product in production | |
Fixed delivery cost per shipment for product ($/shipment) | |
Unit delivery cost per unit product ($/unit) | |
Fixed interval of time between each of shipment of finished item during | |
(time unit) | |
On-hand inventory level of perfect quality items at any time (units) | |
On-hand inventory level of imperfect items at any time (units) | |
On-hand inventory level of finished product at any time (units) | |
Leftover finished product in each (units) | |
Number of delivered finished product in each shipment (units) | |
Completion rate of common component of products as compared to the finished | |
product | |
scaling parameter of unit production cost | |
Total cost of the production system ($) | |
Expected production cycle length (time unit) | |
Expected total cost ($/cycle) |